Samsung Component Placer CP45FV Series Intr oduction 36. From the <Input Status> list box, check if the test board detecting sensors at each point are operating correctly and whether other inputs are operating unde…

100%1 / 109
Transfer & Installation Procedure
7-11
Caution
If the power supply and machine interior are not checked
before turning the main switch on, the machine may
become damaged or the user may get injured. The user
must check the inside and around the machine before
turning on the main switch.
29. If the program is loaded, turn on the <Main Start> switch above the main switch.
Reference
When the program is being loaded, if the <Emergency> switches at the front and rear
sides of the machine are released, “I/O DPRAM Initialization Error” may occur. In this
case, be sure to check whether the <Emergency> switches have been released or not.
30. If all programs have been loaded, turn on the <Ready> switch located in the front
switch panel.
31. Push the X frame and traveling unit slightly to the center of the X axis, so that the
home sensor of each axis cannot be detected. Then, proceed to home them using the
jog box. Before homing, secure the safety of the machine through the following
procedure.
32. Using the teaching box, enlarge the width as wide as necessary.
33. Click ‘Diagnosis’ on the main menu tool bar, then click the <I/O> (F2) on the
auxiliary menu tool bar at the bottom.
Figure 7-10. “I/O Status” dialog box
34. Select the <Conveyor_IN> or <Conveyor_OUT> from the <Output Status> list box.
Then, check if the other outputs are also generated correctly.
35. Once the conveyor begins running, feed the test board through the inlet of the
conveyor.
Samsung Component Placer CP45FV Series Introduction
36. From the <Input Status> list box, check if the test board detecting sensors at each
point are operating correctly and whether other inputs are operating under normal
conditions.
37. Check the factory constant, factory debug and system constant value of the system
setup.
38. If all are in normal condition, begin operating the machine in accordance with the
manufacturing procedure.
Caution
To relocate the machine, first shut down PC on the
machine and turn off the main switch. Then pack it
following the reverse order of installation procedure(No.1~
No.27). When the machine is moved completely, Repeat
the installation procedure(No.1~No.38)
7.1. Warm-Up
Warming Up operation is performed prior to the placement step in order to enhance the
placement precision. Warming Up helps to maintain the system, parts and lubrication oil
at a normal temperature and during winter time prevents the reduction of placement
precision due to contraction of balls, screws, and other components. Approximately 10
minutes of Warming Up is preferable. Warming Up operation is not necessary if less than
2 hours has elapsed from the previous placement work.
Caution
To raise the level of placement precision, Warming UP
must be done.
To raise the level of placement precision, be sure to carry
out warm up before operating the machine.
Operational procedure
1. Select and press <Utility> from the MMI main menu tool-bar. Then select <Warm-
Up> command from the sub menu tool-bar on the left shown.
7-12
Transfer & Installation Procedure
7-13
“Warming Up” dialog box is displayed.
Figure 7-11. “Warming Up” dialog box 1
2. Press <Start> button. Begin Warming Up operation after returning to the original
position. The Elapsed time is displayed in the dialog box.
Warning
Inserting a part of body while the machine is in operation
or in temporary stop could result in severe injury.
Do not insert a part of body while the machine is in
operation or in temporary stop.