Retrofit instructions Short Sleeve 05/2004 Edition 25 4.3 Placement of high component s 4.3.1 Job schedule / ST ART Production 4 Productio n START Job at the s tation ? Job s chedule from LCU YES NO Station coll ecting n…

Retrofit instructions Short Sleeve
05/2004 Edition
24
4
Optimisation process
Comp. higher
than 8.5mm?
STOP Optimisation process
Restrictions
fulfilled?
YES
NO
Step 1:
Bind the high component to last machine of the line
Step 2:
All component which are in the placement shadow have to be omitted
at the specific station.
Step 3:
START first optimisation!
Step 4:
Via the first set-up the user has to verify if there are still components in the
placement shadow placed at the specific machine
Restrictions
fulfilled?
Schedule new job
NO
YES
Step 1 :
The components which are still in the placement shadow
have to be omitted on the specific station
Step 2 :
START optimiser!
Step 3:
Compare again if all rstrictions are fulfilled at the specific machine
YES
NO

Retrofit instructions Short Sleeve
05/2004 Edition
25
4.3 Placement of high components
4.3.1 Job schedule / START Production
4
Production START
Job at
the station ?
Job schedule from LCU
YES
NO
Station collecting nozzles automatically
Stop station
Changing manually to single functions / Nozzle configuration
Change dedicated nozzle by using start step function
The special nozzle for the high component is assigned
in the setup/nozzle changer.
Status: Stand. Segment with standard nozzles are o
n the specific RV head.
Manual change of sleeves and nozzles
Starting manually vacuum- and height reference run
Release station for standard production
YES

Retrofit instructions Short Sleeve
05/2004 Edition
26
4.3.2 Change of setup / STOP Production
4
4
Production STOP
Last PCB
placed?
Further placement
YES
NO
STOP
of station where high components were placed
Changing manually to single functions /
nozzle configuration
Change dedicated nozzle by using start step function
Starting manually vacuum- and height reference run
Reset the
current job on the line computer
Scheduling
following job
Automatically
all nozzles were changed
Automatically
all reference runs are done
Production
of following product