00198365-03_UM_JTF-ML2_TX12_V1-V2_EN.pdf - 第34页

4 Setting up and commissioning 4.2 Retrofitting in the SIPLACE TX-Series 34 User Manual SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019 4.2.5 Performing retrofitting 4.2.5.1 Preparatory steps ► Move the compo…

100%1 / 94
4 Setting up and commissioning
4.2 Retrofitting in the SIPLACE TX-Series
User Manual SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019 33
Fig.36: Nozzle station. IC camera V2 (optional)
Fig.37: Reject box
Fig.38: Empty tape duct, short SIPLACE TX assembly
Fig.39: Mounting support SIPLACE TX-JTF assembly
Fig.40: Cover assembly for SIPLACE JTF-ML/ML2 com-
plete
Cover assembly for SIPLACE JTF-ML/ML2
complete
Consists of:
1. Support frame assembly location 1 for
SIPLACE JTF-ML/ML2 complete
2. Cover assembly on output side location 1,
TX
4.2.3 Tools and equipment required
●
Standard tools
●
Recommended: Allen key extension, ratchet
●
Hammer
●
Punch
●
Feeler gauge
●
Belt tension measuring device [00326015‑xx]
●
Ethanol
Isopropanol – IPA can be used as an alternative.
●
Lint-free cleaning cloths [03082092‑xx]
●
Lifting trolley
●
Second person
●
Assembly instructions "Input and Output Conveyor Extension SIPLACE TX" [00198141‑xx]
4.2.4 Required working time
The complete installation, including the output conveyor extension, will take approx. four hours.
4 Setting up and commissioning
4.2 Retrofitting in the SIPLACE TX-Series
34 User Manual SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019
4.2.5 Performing retrofitting
4.2.5.1 Preparatory steps
► Move the component trolleys out of the machine.
► Switch off the machine, disconnect it from the power supply and secure it to prevent
unauthorized reactivation.
4.2.5.2 Converting the COT insert for the SIPLACE TX
Fig.41: Removing NC 1
► Remove the four screws(1) fastening
the nozzle changer (NC).
Fig.42: Removing NC 2
► Unplug the electrical(1) and pneumatic
connections(2) for the nozzle changer
and put the NC aside.
Fig.43: Removing the NC holder
► Remove the reject bin(1).
► To remove the empty tape duct (4)
remove the screws(3) fastening the
two NC holders(2) and remove the NC
holders.
(The screw holes marked with (5) will be
used for the holder of the big reject bin later
on)
4 Setting up and commissioning
4.2 Retrofitting in the SIPLACE TX-Series
User Manual SIPLACE TX V1/V2 Series JEDEC Tray Feeder (JTF-ML2) 11/2019 35
Fig.44: Removing the empty tape duct
► Remove the two screws (2) holding the
empty tape duct (1).
► Carefully lift the empty tape duct out of
the COT insert.
Fig.45: Dismantling the sensor
► Dismantle the sensor(1) on the right
NC holder.
► Dismantle the vacuum hose and extend
it with the adapter assembly nozzle sta-
tion TX V2 [03169973—xx] (2).
► This is necessary if a CPP head and
the big reject bin with nozzle station are
installed.
Fig.46: Dismantling the rear cover
► Remove the three screws(1) fastening
the rear cover(2).
Now, you can move the cover a bit to the
side and lift it off. Thus, it is easier to thread
the sensor cable.
Fig.47: Converting the sensor
► Push the sensor through the open-
ing(1) on the front cover.