00197790-01.pdf - 第14页
Installation Guide Ausgabe 08/2014 Edition 14 2.4 Connectio n location 1 and loca tion 2 Use a PUN8 hose f irst to route the wire s 03102818- 01 and 03102822- 01 through the m achine. Open the side cover a t location 1…

Installation Guide Ausgabe 08/2014 Edition
13
mount the power supply and the passing clamps to the clamping rail
(see wiring diagram in the apendix for details)

Installation Guide Ausgabe 08/2014 Edition
14
2.4 Connection location 1 and location 2
Use a PUN8 hose first to route the wires 03102818-01 and 03102822-01 through the machine.
Open the side cover at location 1
Route the cables from location 1 through the machine base to outside of the machine.
(ATTENTION: the longer stripped end has to be at location 2)
1

Installation Guide Ausgabe 08/2014 Edition
15
route the cable underneath the transport module
2
3