00198481-01_Technical_Training_E_by_DEK_EN.pdf - 第16页

2 Basic Machine Overview Room for Your Sketches and Notes 16 Technical Training E by DEK 12/2017

100%1 / 114
2 Basic Machine Overview
Room for Your Sketches and Notes
Technical Training E by DEK 12/2017 15
2 Basic Machine Overview
Room for Your Sketches and Notes
16 Technical Training E by DEK 12/2017
3 Setting up the Machine
Technical Training E by DEK 12/2017 17
3 Setting up the Machine
There are 3 main factors to consider when setting up the machine:
Minor Relocation - Moving the machine to another area within the factory
Major Relocation - Moving the machine to another factory or storage
Power Up - Must be performed after Minor or Major Relocation
Preparation
1. With power applied to the machine, home the stencil actuators.
2. Switch OFF and disconnect the electrical power.
3. Disconnect the pneumatic supply.
4. Remove/open the rear print head cover.
Please refer to the Reference Manual for details on the correct procedure when moving / setting up
the machine.