00198076-01_JC_PM_WF1_TX_EN.pdf - 第13页
www.asm-smt.com Equipment required for Workflow 1 Maintenance TX-Series Tools T1 none Vacuum cleaner T2 00377393-01 Waste bin for nozzles T3 00377393-01 Antistatic tweezers T18 00378524-01 Scissors T20 none Flashlight We…

www.asm-smt.com
u Attaching warning signs:
If a machine can be locked, it must be.
However, there are situations where energy isolating devices cannot accom-
modate locks. In these cases, the energy isolating devices must be tagged to
warn employees that the machine is de-energized for servicing. The tag or
label must be securely fastened, it must be placed in a position visible to all
and it may only be removed by the person who attached it.
u Release of stored energy:
Stored energy in the compressed air supply or electrical energy in electrolytic
capacitors must be released by appropriate means.
After switching off the machine, wait until the voltages and the compressed air
have discharged, so that work can be performed without any risk.
u Testing the lock out:
The lock can be easily tested by pressing the START button.
The following steps must be taken to restore the machine to operation.
u Check the working area. Authorized employees should remove all of their tools
and reinstall all safety features.
u Notify all affected employees.
u Before removing even one lock or tag, inform all workers in the affected area
that the machine is going to be restarted.
u Remove all locks/tags.
Every authorized employee must remove his own lock and shut it away.
u Turn the machine on. Make sure that authorized staff check the equipment in
operation to ensure that repairs were performed correctly
Testing
Service personnel may test circuits by energizing them briefly without suspending
the Lock Out / Tag Out Procedure. This may only be done when no other work is
being performed by any other person on the equipment being tested.
It is extremely important that all remote START switches be tagged with the "Do
Not Operate" tag to prevent inadvertent operation of the equipment during these
periods.
Responsibilities
• It shall be the responsibility of the maintenance and service personnel to make
sure this procedure is adhered to.
• It shall be the responsibility of the maintenance and service personnel's imme-
diate supervisor to instruct his personnel on this procedure.
• It shall be the responsibility of the Safety Officer with assistance from the
Safety Committee, Health Service Department, and the various managers and
vice-presidents to administer the Lock Out / Tag Out Procedure.

www.asm-smt.com
Equipment required for Workflow 1 Maintenance TX-Series
Tools
T1 none Vacuum cleaner
T2 00377393-01 Waste bin for nozzles
T3 00377393-01 Antistatic tweezers
T18 00378524-01 Scissors
T20 none Flashlight
Wear parts
W2 03066107-02 Nozzle magazine with nozzles 20xx/28xx
W35 03105638-01 Nozzle magazine with nozzles 40xx/42xx
Consumables
C3 03082092-01 Lint free clothes

www.asm-smt.com