N7201A617E00_0317.pdf - 第17页

NPM-W 2 EJM7DE-CT-01 M-00 -1 Overview -1-1 Calibration performance -1-2 Calibration item and action -1-3 Jigs used for calibration -1-4 Explanation of screen -2 Head camera XY origin -3 Plane correction XY -4 Head / Plan…

100%1 / 572
NPM-W2 EJM7DE-CT-01M-00
S-16
12
Consumable
parts
replacement
-1
Replacing the transfer belt of the
PCB transfer conveyor
-2
Replacing the PCB transfer belt of
the extension conveyor
(Option)
-3
Replacing the batteries
-4
Replacing the dummy dispensing
tape
(dispensing head(option))
-5
Replacing the cushion (wiping
station)
(dispensing head(option))
-6
Replacing the air filter element of
the placement head
(Light weight 16-
nozzle)
-7
Replacing the air filter element of
the placement head
(12-nozzle)
-8
Replacing the air filter element of
the placement head
(8-nozzle)
-9
Replacing the air filter element of
the placement head
(3-nozzle)
Replacement
11
-1
Head and nozzle changer
replacement
-2
A
ttachment without head
-3
Mode switch
-3-1
Switching to the single lane mode
-3-2
Confirming switch
NPM-W2 EJM7DE-CT-01M-00
-1
Overview
-1-1
Calibration performance
-1-2
Calibration item and action
-1-3
Jigs used for calibration
-1-4
Explanation of screen
-2
Head camera XY origin
-3
Plane correction XY
-4
Head / Plane correction Z
-5
Width adjustment
-6
Placement position/Conveyor
-7
Height sensor (option)
-8
Placement load
-8-1
Placement load
-8-2
How to use placement load measurement jig
(option)
-9
Multi-recognition camera
-10
Jig station
-11
Split recognition (option)
-12
Dispensing head
-13
Overview of calibration of 2D
inspection head
-14
White balance (2D inspection head)
-15
Camera offset (2D inspection head)
-16
Image quality correction (2D inspection
head)
-17
Inspection plane correction (2D
inspection head)
-18
Pickup position
-19
Tray
-20
Transfer
-21
Accuracy verification
-21-1
Overview
-21-2
Detailed process
S-17
13
Calibration
NPM-W2 EJM7DE-CT-01M-00
S-18
14
Installation
15
Others
16
Reference
-1
Plastic parts listing
-2
Safety data sheet (SDS)
-1
Before installation
-2
Transportation
-3
Installation
-4
Main power connection
-4-1
Checking voltages of the primary power supply
and the machine
-4-2
Connection of the main power supply
-4-3
Adjusting voltages of the primary power supply
and the machine
-5
Connection of air source and power
supply
-6
Peripheral device connection
-6-1
Line configuration
-6-2
Line signal specifications
-6-3
Ethernet cables LWS (line work station)
-6-4
Cable length
-6-5
Settings when connected to LNB
-7
PCB transfer settings
(when connected to non-NPM-W2 equipment)
-8
How to handle the tray feeder
(option)
-9
2D inspection head (option)
-10
Attaching and detaching the safety
cover
(option)
-1
Machine information
-2
Update
-2-1
Updating the machine system
-2-2
Updating the firmware
-3
Option license
-4
Common parameters