m330_01_gas_cabinet气柜.pdf.pdf - 第29页
MAINTENANCE G AS CABINET R EFERENCE M ANUAL 5-5 5.6 Preventive maintenance processes Daily maintenance: Check system for any alarms during process and/or standby. Check system and/or logging for base pr essure value. (Th…

MAINTENANCE
GAS CABINET REFERENCE MANUAL
5-4
Yearly Maintenance:
Replace the filters once a year to avoid clogging.
Pressure Leak-check: Perform a pressure leak-check once a year
------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------

MAINTENANCE
GAS CABINET REFERENCE MANUAL
5-5
5.6 Preventive maintenance processes
Daily maintenance:
Check system for any alarms during process and/or standby.
Check system and/or logging for base pressure value. (This will indicate that
with any major rise the vacuum pump and/or line can have problems)
Check the vacuum atmosphere switch, adjust to atmospheric pressure. LED
should light up.
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
Weekly maintenance:
Check the pump status.
If applicable, check TEOS system bubbler temperature.
Check the tightness of the vacuumline connections
• Front flange screws.
• Ball joint clamp.
Check the waterflow on the flanges and the heatexchanger.
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------

MAINTENANCE
GAS CABINET REFERENCE MANUAL
5-6
Monthly maintenance:
Replace the O-ring on the Loaddoor.
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
Yearly maintenance:
Clean complete vacuum lines of the system.
Full check on the vacuum pumps.
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------