m330_01_gas_cabinet气柜.pdf.pdf - 第29页

MAINTENANCE G AS CABINET R EFERENCE M ANUAL 5-5 5.6 Preventive maintenance processes Daily maintenance: Check system for any alarms during process and/or standby. Check system and/or logging for base pr essure value. (Th…

100%1 / 31
MAINTENANCE
GAS CABINET REFERENCE MANUAL
5-4
Yearly Maintenance:
Replace the filters once a year to avoid clogging.
Pressure Leak-check: Perform a pressure leak-check once a year
------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------
MAINTENANCE
GAS CABINET REFERENCE MANUAL
5-5
5.6 Preventive maintenance processes
Daily maintenance:
Check system for any alarms during process and/or standby.
Check system and/or logging for base pressure value. (This will indicate that
with any major rise the vacuum pump and/or line can have problems)
Check the vacuum atmosphere switch, adjust to atmospheric pressure. LED
should light up.
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
Weekly maintenance:
Check the pump status.
If applicable, check TEOS system bubbler temperature.
Check the tightness of the vacuumline connections
Front flange screws.
Ball joint clamp.
Check the waterflow on the flanges and the heatexchanger.
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
MAINTENANCE
GAS CABINET REFERENCE MANUAL
5-6
Monthly maintenance:
Replace the O-ring on the Loaddoor.
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
Yearly maintenance:
Clean complete vacuum lines of the system.
Full check on the vacuum pumps.
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------