Splice Detection Basic Package HS-50 2 Assembly inst ructions Splice Detection Basic Package SIPLACE HS-50 03/2008 Edition 27 2 Abb. 2.12 - 8 Laying the cables from locations 2 and 3 2 : Plug the 4 C A T5 cables in to th…

100%1 / 30
2 Assembly instructions Splice Detection Basic Package SIPLACE HS-50 Splice Detection Basic Package HS-50
03/2008 Edition
26
: To do this, pull the narrow end of the cable through the assembly hole in the cover, and fix the
wide plug using the enclosed oval head screw (see Fig. 16 - 6).
2
Abb. 2.12 - 6 Machine cover
: Then, starting from the panels, run the narrow ends of the cables through the machine to the
hub (see Fig. 16 - 7 and 16 - 8) using the pilot wire provided.
2
Abb. 2.12 - 7 Routing cables through the machine
Splice Detection Basic Package HS-50 2 Assembly instructions Splice Detection Basic Package SIPLACE HS-50
03/2008 Edition
27
2
Abb. 2.12 - 8 Laying the cables from locations 2 and 3
2
: Plug the 4 CAT5 cables into the sockets on the hub unit
Cable sector 1 to table number 1 on the HUB unit
Cable sector 2 to table number 2 on the HUB unit
Cable sector 3 to table number 3 on the HUB unit
Cable sector 4 to table number 4 on the HUB unit.
DANGER
Before starting the placement machine connect and bolt the HUB electrical conducting with the
machine frame! 2
: Switch on the placement machine at the main switch.