00198586-02_JC_PMWF2_TX_V2_EN.pdf - 第4页
www.asm-smt.com Table of Contents

www.asm-smt.com
Introduction
Safety Introduction
Equipment required for Workflow 2 Maintenance TX V2
1 Check the head status of the C&P20x to be maintained
2 Shut down, remove all tables (COT) and exchange all nozzles
3 Empty and clean the reject bin
4 Remove the C&P20x to be maintained
5 Return a maintained C&P20x
6 Clean the Z-Axis of the remaining C&P20x heads
7 Check and clean the magnetic surfaces and scale of X and Y-Axis
8 Clean the conveyor, lifting tables and gantry cables
9 Clean the fiducial bars (TX V2 micron and HD only)
10 Clean the stationary camera (CPP/ TH)
11 Clean the feeder modules and cut the tapes
12 Switch on the machine and return the tables (COT)
13 Calibrate the maintained C&P20x
14 Check the cover fans
15 Check the filter discs of all C&P20x
16 Check the nozzle status of all C&P heads
17 Endurance run
Table of Contents

www.asm-smt.com
Table of Contents

www.asm-smt.com
Introduction
To ensure that your SIPLACE machine is always in perfect condition for use in your production environment, the machine should be maintained on a regular basis. In or-
der to optimize the "Uptime" for each maintenance interval four workflows have been defined combining the individual steps to form an efficient sequences of tasks to be
performed. All workflows are explained in detail and illustrated with clear diagrams.
Maintenance workflows
Each workflow is supported with a document (job card), which guides you efficiently through the maintenance work.
– Workflow 1: Weekly maintenance tasks.
– Workflow 2: Combination of weekly and 3-monthly maintenance tasks.
– Workflow 3: Combination of weekly and 6-monthly maintenance tasks.
– Workflow 4: Combination of weekly and 12-monthly maintenance tasks.
Planning workflows
Example for the frequency of individual workflows over a period of one year.
– Workflow 1: 45 times / year
– Workflow 2: 4 times / year
– Workflow 3: 2 times / year
– Workflow 4: 1 time / year