M1_ServiceManual_e.pdf - 第8页
1 Installation 1-1 1 Installation

Contents
1 Installation................................................................................................... 1-1
Installation of Mounter .......................................................................................................1-2
Environmental Requirements....................................................................................1-2
Production Line ........................................................................................................1-3
Installing the Mounter...............................................................................................1-4
Connecting Loader with Mounter.......................................................................................1-6
Pre-Process and Post-Process of Mounter ..........................................................................1-7
Connecting Pre-Process and Post-Process................................................................1-7
Sequence of Receiving PC board (Standard spec.)...................................................1-8
Sequence of Sending PC board (Standard sepc.)......................................................1-9
Sequence of Receiving PC board (SMEMA Interface spec.) .................................1-10
Sequence of Sending PC board (SMEMA Interface spec.) ....................................1-11
2 Periodical Checks.......................................................................................2-1
Daily Checks.......................................................................................................................2-2
Visual Check.............................................................................................................2-2
Manual Check ...........................................................................................................2-4
Monthly Check....................................................................................................................2-5
3 Mechanical Section .................................................................................... 3-1
Head ....................................................................................................................................3-2
Nozzle .................................................................................................................................3-3
Nozzle Recognition Stickers...............................................................................................3-4
Labeling a Nozzle ID Sticker to a Nozzle ................................................................3-4
Cleaning Nozzle Recognition Stickers .....................................................................3-5
Camera ................................................................................................................................3-6
Cleaning of Lens Filter .............................................................................................3-6
Cleaning of Scan Camera..........................................................................................3-6
Lubrication..........................................................................................................................3-7
Lubrication Points.....................................................................................................3-7
Specified Lubricants ...............................................................................................3-14
4 Electrical Section........................................................................................4-1
Floppy Disk and Disk Drive ...............................................................................................4-2
Handling Floppy Disk...............................................................................................4-2
Cleaning of Disk Drive.............................................................................................4-3
Control Board .....................................................................................................................4-4
Handling Control Board............................................................................................4-4
Electrodes on Feeder / Feeder Bank ...................................................................................4-5

1 Installation
1-1
1
Installation

1 Installation
1-2
Installation of Mounter
Environmental Requirements
Install the mounter where the below conditions are met.
Do not do tasks, such as moving the machine or connecting the machine with the main switch ON to
prevent electric shock.
■ Ambient Temperature: 15 to 35 degrees C
■ Relative Humidity: 45 to 60 percent, non-condensing
■ Atmosphere: Dust and corrosive gas free
■ Floor: Floor must be flat and sturdy enough for freedom from vibration during
operation.
■ Power Requirements: 200 VAC +/- 10%, three phase, 50/60 Hz
* 208/220/230/240/380/400/415/440 VAC with optional power
transformer
Power consumption: 2 kW
Capacity: 5 kVA
Leakage current: 100mA or less
* Power and ground the machine independently of other machines which may be a
noise source, such as a compressor, welding machine, or reflow soldering machine
with magnetic contacts.
Warning