JUKI FX-3R Maintenance Manual.pdf - 第4页
Repl acing the S uppo rt Ta ble E NC Repl acing the B acku p Sto pper (for E N T ype O nly) Auto PWB Wid th Ad justm ent Repla cing the A WC M otor Repla cing the A WC O rigin Sens or Repla cing the T ransp ort St opper …

Replacing the Head Main Board
Replacing the ZT-Driver Board
Replacing the OCC Assembly
Replacing the CCD Camera and Lens
Replacing the OCC Coaxial/Angle Light Board Assemblies
Replacing the Lens Filter
Adjusting the Focus
Adjusting the OCC Light Quantity
Replacing the Solder Recognition Light Board
Readjustment After Replacement of OCC Unit
Replacing the Transport Belt
Replacing the Transport Pulley
Transport Pulley A Assembly: E21117150A0
Replacing the STATION, IN, OUT, and JOINT Motors
Replacing the IN and OUT Sensors
Replacing the WAIT, STOP, and C-OUT Sensors
Replacing the Fiber
Replacing the Amplifier Unit
Adjusting the Sensitivity of the WAIT/STOP/C-OUT Sensor
Replacing the Stopper Cylinder
Replacing the Support Table Home Position Sensor (BU Home
Position Sensor)
Replacing the T-PIN Sensor (Optional)
Replacing the Pusher Y Cylinder (Outer Shape Reference)
Replacing the Centering Pin (Optional)
Replacing the Support Table Motor (BU Motor)
Adjusting the Gap between Torque Supporter and Support Motor
Adjusting the Tension of the Support Table Driving Timing Belt
Placing the Support Table Surface Horizontally

Replacing the Support Table ENC
Replacing the Backup Stopper (for EN Type Only)
Auto PWB Width Adjustment
Replacing the AWC Motor
Replacing the AWC Origin Sensor
Replacing the Transport Stopper Interference Sensor
Replacing the Barcode Reader (On-Demand Production, Option for
SCS)
Replacing the CAL Board Assembly
Replacing the Air Cylinder
Replacing the ATC OPEN and CLOSE Sensors
Adjusting the Speed Controller
Common Parts and Units for Mechanical Feeder and Electric Feeder
Replacing the Bank-Up Cylinder
Adjusting the Speed Controller of the Bank-Up Cylinder (Optional
Replacement Table)
Replacing the Bank-Up Detection Sensor (Optional Replacement Table)
Replacing the Selector Switch (Optional Replacement Table)
Replacing the Roller Lever (Optional Replacement Table)
Replacing the Cables and Connectors of Replacement Table (For Intelli
trolley)
Replacing the Antenna of the Replacement Table (For Intelli trolley)
Bank and Replacement Table for Mechanical Feeder
Overall Drawing
8-2.2. Replacing the Drive Cylinder
Adjusting the Speed Controller of the Drive Cylinder
Replacing the Feeder Bank Board (Optional)
Replacing the Bank PCB
Replacement Table for Electric Feeder
Overall Drawing (Replacement Table for ETF)

Overall Drawing (Lifter Unit)
Replacing the Bank PCB
Replacing the Connector Cable
Replacing the Connector for Off-line Setup
Replacing the ETF Incorrect Insertion Detection Sensor
Electric Fixed Bank (Optional)
Overall Drawing
Replacing the Outer Bank PCB and Connector Cable
Replacing the Connector for Off-line Setup
Replacing the ETF Incorrect Insertion Detection Sensor
Replacing the Digital Pressure Switch (Positive Pressure)
Adjusting the Digital Pressure Switch (Positive Pressure)
Replacing the Filter Element
Replacing the Digital Pressure Switch (Negative Pressure)
Adjusting the Digital Pressure Switch (Negative Pressure)
Replacing the Push-Button Switch
Replacing the EMERGENCY STOP Switch
Replacing the Cover Open Switch
Switch Main Unit
Operation Key
Replacing the Push-Button Switch (CE Marking Machine)
LCD Monitor
Replacing the LCD Monitor
Setting Up the Touch Panel (TECNART, TM150-JDA03)
Replacing the System Disk
Replacing the SSD
Setting Up the BIOS
Setting Up the Network (This setup is required when communicating with the
IS.)
Installing the FX-3R System Programs and Flexline DB