00194340-01.pdf - 第28页

Retrofit Instructions & User’s Manual / Automatic Vacuum Support Pins (AVSP) Edition 04/2006 2.4.3 Teach pendant installation → Connect pendant’s cable to I/O board and lay the cables a s according to Figure 2.4.3-2.…

100%1 / 54
Retrofit Instructions & User’s Manual / Automatic Vacuum Support Pins (AVSP)
Edition 04/2006
Figure 2.4.2-4 Electrical cable layout dual conveyor HS-60
2-23
Retrofit Instructions & User’s Manual / Automatic Vacuum Support Pins (AVSP)
Edition 04/2006
2.4.3 Teach pendant installation
Connect pendant’s cable to I/O board and lay the cables as according to Figure 2.4.3-2.
Tie up cablings together with the cable tie (Item No.: 00805140-FS) and bases (Item No.:
00318666-FS) provided.
NOTE
I/O board is designed to accommodate 2 teach pendants that controls AVSP on 4 placement
areas. However, if AVSP is not necessary at all placement areas, laying of cables can be
skipped at the unused areas. This will not affect the operation of used area.
Following then, lay the end of pendant’s cable out of the machine thru the opening on
machine’s frame.
Fix the teach pendant at location shown and connect it to cable.
Repeat similar steps for another teach pendant if necessary.
Reassemble all the covers and trunking. Reassemble all lifting table’s top plate &
component table.
Figure 2.4.3-1 Pendant’s location for placement 1 & 4 (Left), 2 & 3 (Right)
2-24
Retrofit Instructions & User’s Manual / Automatic Vacuum Support Pins (AVSP)
Edition 04/2006
Figure 2.4.3-2 Pendant’s cable layout for dual conveyor HF-Series
2-25