00198424-03_JC_PM_WF3_JTF-ML2_EN.pdf - 第3页

www.asm-smt.com Introduction Safety Introduction Equipment required for Workflow 3 Maintenance JTF-ML2 1 Clean Cassette 2 Remove tables (COT) (JTF-ML2) 3 Shut Down Machine 4 Remove Conveyor 5 Remove Tower 6 Clean Conveyo…

100%1 / 46
All names identified by ® are registered trademarks of ASM Assembly Systems GmbH & Co. KG. The remaining trademarks in this publication may be trademarks whose use by third parties
for their own purposes could violate the rights of the owner.
We have reviewed the contents of this publication to ensure consistency with the hardware and software described. Since variance cannot be precluded entirely, we cannot guarantee full
consistency. However, the information in this publication is reviewed regularly and any necessary corrections are included in subsequent editions.
Copyright © ASM Assembly Systems Technical data subject to change
ASM Assembly Systems Singapore Pte Ltd
535 Yishun Industrial Park A
ASM Tech-Park Building 2
Singapore 768775
Item no.: 00198424-03
www.asm-smt.com Printed by ASM Assembly Systems
www.asm-smt.com
Introduction
Safety Introduction
Equipment required for Workflow 3 Maintenance JTF-ML2
1 Clean Cassette
2 Remove tables (COT) (JTF-ML2)
3 Shut Down Machine
4 Remove Conveyor
5 Remove Tower
6 Clean Conveyor (JTF-ML2)
7 Clean Tower and maintain Ball screw
8 Linear guide (Lifting axis)
9 Mount tower back onto TX machine
10 Mount conveyor back onto TX machine
11 Switch on machine and return the tables
12 Conduct reference run for JTF-ML2 and refill cassettes
13 Restart Production
Table of Contents
www.asm-smt.com
Table of Contents