Spectrum+Operating+Manual.pdf - 第130页
S2-9 XX X Se ri es Disp ensi n g Syst em IOM Man ual Maintenance 6-18 © 2023 Nordson Corporatio n 6.11 Tensioning the C ables Per io di c te nsi on i ng of th e dispensing system me cha nica l dri ve cables c an pr event…

S2-9XXX Series Dispensing System IOM Manual Maintenance
© 2023 Nordson Corporation 6-17
Figure 6-9 Lubricating the X-Axis Linear Guides
Figure 6-10 Lubricating the Y-Axis Linear Guides

S2-9XXX Series Dispensing System IOM Manual Maintenance
6-18 © 2023 Nordson Corporation
6.11 Tensioning the Cables
Periodic tensioning of the dispensing system mechanical drive cables can prevent premature failure of the
cables. For dispensing system operating in a 24/7 production environment, tension the mechanical drive
cables approximately every six months. For systems operating in a single-shift environment (eight hours a
day or less), this should be done once a year.
Tools and Materials Needed:
• Hex Wrench Set
WARNING! This procedure should only be performed by a trained service technician.
6.11.1 Tensioning the X/Y Cables
To tension the X/Y cables (Figure 6-11):
1. Perform a service shutdown, see 2.14 Service Shutdown.
2. Open the dispensing area door.
3. Loosen the X-axis and two (2) Y-axis tensioner screws.
4. Manually move the Z-head in a circle around the entire length and width of the dispensing
area approximately five (5) times.
5. Stop in the center of the dispensing area.
6. Retighten the tensioner screws.
Figure 6-11A Tensioning the X-Axis Cables
Figure 6-11B Tensioning the Y-Axis Cables
Item
Description
1 X-Axis Tensioner Screw
2 Y-Axis Tensioner Screw (only 1 shown)
Figure 6-11 Tensioning the Cables
2
1

S2-9XXX Series Dispensing System IOM Manual Maintenance
© 2023 Nordson Corporation 6-19
6.11.2 Tensioning the Z Cable
To tension the Z cable (Figure 6-12):
1. Perform a service shutdown, see 2.14 Service Shutdown.
2. Open the dispensing area door.
3. Use an M3 hex key to loosen (one turn) the tensioner screw.
WARNING! DO NOT remove the tensioner screw. If removed, the entire Z-head must be
disassembled.
4. Manually move the dispensing head up and down the full length of the axis. Repeat
three (3) to five (5) times.
5. Tighten the tensioner screw.
6. Close the dispensing area door.
Item
Description
1
Tensioner Screw
Figure 6-12 Tensioning the Z-Axis Cables
1