Major Maintenance
Maintenance Intervals for Major Maintenance
Maintenance Manual SIPLACE X Series 65
DLM C&P6/12 head
Maintenance task Duration
[min]
CP6/12
Each
week
Every 3
months
Every 6
months
Every 12
months
Clean the read unit for the turning station 2/2 X
Z axis:
Clean and grease the toothed belt
Clean the toothed belt
Clean the rollers and toothed wheels
Check the toothed belt for wear
Grease the toothed belt
Check the Z axis guide
Check the jaws
Grease the Z axis guide
6/6 X
Star:
Clean the star and the vacuum distributor
disk
Grease the running surface of the star
brake
Clean the segments
Remove dirt from around the segments
3/4 X
Distributor:
Clean and grease the O-rings
Check for damage
Clean the distributor
Blow air through the distributor
Check the ball catches
Clean the seat
3/3 X
Star brake:
Check for damage and function
Wipe/remove grease
Fill the holes with grease
Grease the surface
2/2 X
Valve adjustment drives:
Clean the valve adjustment drives
Clean the disk and the space between
Clean the ball bearings
Check that the ball bearings are working
correctly
Remove visible dirt
2/2 X
Turning station:
Clean the black O-rings
Check the O-ring for damage
Check the toothed belt for damage
Clean the stop faces
Clean the friction wheel
4/4 X
Major Maintenance
Maintenance Intervals for Major Maintenance
66 Maintenance Manual SIPLACE X Series
* see also maintenance display
See also
1.3.2 Calculation of Maintenance Intervals [ ➙ 14]
Vacuum generator:
Installation/removal
Clean the Venturi nozzles
Blow air through Venturi nozzles
Clean and grease the O-rings
Clean and blow through the vacuum
generator block.
Silencer: remove
Silencer: clean holes to the Venturi
nozzles
Silencer: check for dirt
Silencer: check the plastic fixtures
6/6 X
Component sensor
Clean the component sensor
1/1 X
Installation and removal of the head front
section
6/6 X
Calibrate and measure 20/25 X
Maintenance task Duration
[min]
CP6/12
Each
week
Every 3
months
Every 6
months
Every 12
months
Major Maintenance
Consumables, Spare and Wear Parts, Tools Maintenance Tasks for Base Machine
Maintenance Manual SIPLACE X Series 67
Mainten ance Task s for Base Machi ne
5.2 Maintenance Tasks for Base Machine
Consumables, Spare and Wear Parts, Tools
5.2.1 Consumables, Spare and Wear Parts, Tools
If required, gas pressure shock absorber 560 N (for cover above 2 gantries) [03036763-xx] or gas
pressure shock absorber 510 N (for cover above 1 gantry) [03039170
-
xx]
ESD wristband [00320279-xx]
Set of Allen wrenches
If required, cover switch [03020409-xx]
Preparatory Steps
5.2.2 Preparatory Steps
There must be no PCBs on the PCB conveyor for the following jobs.
Switch off the machine, disconnect it from the power supply and secure it to prevent unauthorized
reactivation. Observe the instructions in section "1.2 Preparatory Work..." [ ➙ 11].
Performing Maintenance Tasks
5.2.3 Performing Maintenance Tasks
Cleaning the Gas Pressur e Shock A bsorbers on the P rotective Covers
5.2.3.1 Cleaning the Gas Pressure Shock Absorbers on the Protective Covers
Open the protective covers.
Wipe the sliding surfaces of the gas pressure shock
absorbers (1) clean with a lint-free cloth.
There should be no oil visible on the pistons:
otherwise replace the gas pressure shock absorbers.
For removal and installation details, read the service
manual for the respective machine.
Close the machine safety covers.