X-Series-Maintenance-Manual(1).pdf - 第66页
Major Maintenance Maintenance Intervals for Major Maintenance 66 Maintenance Manual SIPLACE X Series * see also maintenance display See also 1.3.2 Ca lculation of Mainten ance Interv als [ ➙ 14] Vacuum gen erator: ▪ In…

Major Maintenance
Maintenance Intervals for Major Maintenance
Maintenance Manual SIPLACE X Series 65
DLM C&P6/12 head
Maintenance task Duration
[min]
CP6/12
Each
week
Every 3
months
Every 6
months
Every 12
months
Clean the read unit for the turning station 2/2 X
Z axis:
▪ Clean and grease the toothed belt
▪ Clean the toothed belt
▪ Clean the rollers and toothed wheels
▪ Check the toothed belt for wear
▪ Grease the toothed belt
▪ Check the Z axis guide
▪ Check the jaws
▪ Grease the Z axis guide
6/6 X
Star:
▪ Clean the star and the vacuum distributor
disk
▪ Grease the running surface of the star
brake
▪ Clean the segments
▪ Remove dirt from around the segments
3/4 X
Distributor:
▪ Clean and grease the O-rings
▪ Check for damage
▪ Clean the distributor
▪ Blow air through the distributor
▪ Check the ball catches
▪ Clean the seat
3/3 X
Star brake:
▪ Check for damage and function
▪ Wipe/remove grease
▪ Fill the holes with grease
▪ Grease the surface
2/2 X
Valve adjustment drives:
▪ Clean the valve adjustment drives
▪ Clean the disk and the space between
▪ Clean the ball bearings
▪ Check that the ball bearings are working
correctly
▪ Remove visible dirt
2/2 X
Turning station:
▪ Clean the black O-rings
▪ Check the O-ring for damage
▪ Check the toothed belt for damage
▪ Clean the stop faces
▪ Clean the friction wheel
4/4 X

Major Maintenance
Maintenance Intervals for Major Maintenance
66 Maintenance Manual SIPLACE X Series
* see also maintenance display
See also
1.3.2 Calculation of Maintenance Intervals [ ➙ 14]
Vacuum generator:
▪ Installation/removal
▪ Clean the Venturi nozzles
▪ Blow air through Venturi nozzles
▪ Clean and grease the O-rings
▪ Clean and blow through the vacuum
generator block.
▪ Silencer: remove
▪ Silencer: clean holes to the Venturi
nozzles
▪ Silencer: check for dirt
▪ Silencer: check the plastic fixtures
6/6 X
Component sensor
▪ Clean the component sensor
1/1 X
Installation and removal of the head front
section
6/6 X
Calibrate and measure 20/25 X
Maintenance task Duration
[min]
CP6/12
Each
week
Every 3
months
Every 6
months
Every 12
months

Major Maintenance
Consumables, Spare and Wear Parts, Tools Maintenance Tasks for Base Machine
Maintenance Manual SIPLACE X Series 67
Mainten ance Task s for Base Machi ne
5.2 Maintenance Tasks for Base Machine
Consumables, Spare and Wear Parts, Tools
5.2.1 Consumables, Spare and Wear Parts, Tools
▪ If required, gas pressure shock absorber 560 N (for cover above 2 gantries) [03036763-xx] or gas
pressure shock absorber 510 N (for cover above 1 gantry) [03039170
-
xx]
▪ ESD wristband [00320279-xx]
▪ Set of Allen wrenches
▪ If required, cover switch [03020409-xx]
Preparatory Steps
5.2.2 Preparatory Steps
► There must be no PCBs on the PCB conveyor for the following jobs.
► Switch off the machine, disconnect it from the power supply and secure it to prevent unauthorized
reactivation. Observe the instructions in section "1.2 Preparatory Work..." [ ➙ 11].
Performing Maintenance Tasks
5.2.3 Performing Maintenance Tasks
Cleaning the Gas Pressur e Shock A bsorbers on the P rotective Covers
5.2.3.1 Cleaning the Gas Pressure Shock Absorbers on the Protective Covers
► Open the protective covers.
► Wipe the sliding surfaces of the gas pressure shock
absorbers (1) clean with a lint-free cloth.
► There should be no oil visible on the pistons:
otherwise replace the gas pressure shock absorbers.
For removal and installation details, read the service
manual for the respective machine.
► Close the machine safety covers.