4Q4CEIM.pdf - 第15页
Page 1-3 INST ALLA TION 1 1-1-2 Power Source and Air Source A) Power source 1. Power source should be connected by using the attached 5-line shielding cable. 2. Before turning ON the power, confirm the conditions before.…

Page 1-2
4Q4C-E-IMA01-A01-01
1-1 Preparations for Installation
1-1-1 Selecting the Location
1. The machine should be placed on the horizontal place.
2. The conditions are as follows. (No moisture condensation).
• Temperature : 10 ˚C to 35 ˚C
• Temperature difference : Lower than 1 ˚C per min
• Humidity : 25 % to 60 %
3. The following condition is also required.
Refer to the arrangement diagram and keep the enough space for maintenance.

Page 1-3
INSTALLATION
1
1-1-2 Power Source and Air Source
A) Power source
1. Power source should be connected by using the attached 5-line shielding cable.
2. Before turning ON the power, confirm the conditions before.
• Power supply should be 3 phases, AC 400 V ±10 V, 50/60 Hz.
Maximum of acceptable fluctuation ±5 %.
Power : 1.5 kVA (CM201-DU) and 2.5 kVA (CM202-DU, CM202-DHU)
3. The transformer is changeable between 4 levels of voltage.
1. 420 V 2. 400 V 3. 380 V
4. Ensure that the secondary voltage is AC 200 V ±10 V.
5. Set the polarity with the rotating direction of the blower motor.
B) Main power terminal connection
Open the cover on the lower right of the front side, and the terminal table is fixed. Connect the
main power, not to make a mistake in the terminal number.
4Q4C-E-IMA01-A01-02
Preparations for Installation
M 92E
POWER AND AIR SOURCES SHOULD BE CONNECTED AT THE LAST OF
INSTALLING OPERATION.
If they are connected earlier, you may get an electric shock or injured.
WARNING
L1L1 L2 L3 N PEPE
L1L1 L2 L3 N PEPE
5-line shielding cable for power supply
4Q4C-001E
Red (L1)
White (L2) Black (L3)
5-line shielding cable
Shielding wire
Red
White
Blue
Shielding wire
4U4C-901EU
Green/Yellow (PE)
Green/Yellow
Blue (N)
Black

Page 1-4
C) Air source
1. Air pressure should be supplied to the A section on figure.
2. The clean air using the air dryer should be supplied.
• The air pressure : 0.49 MPa
(Nipple size for hose connection is 3/8).
After air supply, set the pressure to 0.49 MPa by the regulator.
• Amount of supplied air : more than 150 l / min (CM201-DU) and 300 l / min (CM202-
DU,CM202-DHU).
(When the bulk feeder is used, 8 l / min per bulk feeder is separately necessary).
Drain hose (inner diameter 20 mm)
Pressure switch
Air hose (5m)
Filter
(inside)
Air without oil
To each equipment
Regulator
Primary air
A
Primary air
source side
Preparations for Installation
4Q4C-E-IMA01-A01-01
4U4C-901EU