Page 1-4 C) Air source 1. Air pressure should be supplied to the A section on figure. 2. The clean air using the air dryer should be supplied. • The air pressure : 0.49 MPa (Nipple size for hose connection is 3/8). After…

Page 1-3
INSTALLATION
1
1-1-2 Power Source and Air Source
A) Power source
1. Power source should be connected by using the attached 5-line shielding cable.
2. Before turning ON the power, confirm the conditions before.
• Power supply should be 3 phases, AC 400 V ±10 V, 50/60 Hz.
Maximum of acceptable fluctuation ±5 %.
Power : 1.5 kVA (CM201-DU) and 2.5 kVA (CM202-DU, CM202-DHU)
3. The transformer is changeable between 4 levels of voltage.
1. 420 V 2. 400 V 3. 380 V
4. Ensure that the secondary voltage is AC 200 V ±10 V.
5. Set the polarity with the rotating direction of the blower motor.
B) Main power terminal connection
Open the cover on the lower right of the front side, and the terminal table is fixed. Connect the
main power, not to make a mistake in the terminal number.
4Q4C-E-IMA01-A01-02
Preparations for Installation
M 92E
POWER AND AIR SOURCES SHOULD BE CONNECTED AT THE LAST OF
INSTALLING OPERATION.
If they are connected earlier, you may get an electric shock or injured.
WARNING
L1L1 L2 L3 N PEPE
L1L1 L2 L3 N PEPE
5-line shielding cable for power supply
4Q4C-001E
Red (L1)
White (L2) Black (L3)
5-line shielding cable
Shielding wire
Red
White
Blue
Shielding wire
4U4C-901EU
Green/Yellow (PE)
Green/Yellow
Blue (N)
Black

Page 1-4
C) Air source
1. Air pressure should be supplied to the A section on figure.
2. The clean air using the air dryer should be supplied.
• The air pressure : 0.49 MPa
(Nipple size for hose connection is 3/8).
After air supply, set the pressure to 0.49 MPa by the regulator.
• Amount of supplied air : more than 150 l / min (CM201-DU) and 300 l / min (CM202-
DU,CM202-DHU).
(When the bulk feeder is used, 8 l / min per bulk feeder is separately necessary).
Drain hose (inner diameter 20 mm)
Pressure switch
Air hose (5m)
Filter
(inside)
Air without oil
To each equipment
Regulator
Primary air
A
Primary air
source side
Preparations for Installation
4Q4C-E-IMA01-A01-01
4U4C-901EU

Page 1-5
INSTALLATION
1
M/C
950
116
H
A
1
2
3
Preparations for Installation
1-1-3 Foundation
It requires the flat concrete floor for the foundation of installation.
Confirm the enough endurance of the soil.
• Endurance of the soil : more than 6570 N/m
2
1-1-4 Lifting
A) Use the forklift for loading to or unloading from the truck.
In case of using crane, the special parts are necessary.
B) In case of replacement within the factory.
1 Rotate the leveling block A, and lift it so that the bottom of the machine is higher than the pallet
truck (H).
2 Place the pallet truck under the machine.
3 Lift the pallet truck to lift up the machine. (The number of pallet truck usage is different up to its
weight.)
4 Carry it to the right position.
1-1-5 Arrangement Diagram
Draw the reference line of the machine by the arrangement diagram.
Board transfer
height
493C-004E
4Q4C-E-IMA01-A01-01