Operation BWP Issue 2.pdf - 第24页

24 Issue 2, Nov 14 Operation Checkl ist (Continued) Tooling  Correct type  Set up correctl y  Stencil support used  Clean and free f rom damage  Storage adequat e Comm ents: Pre-Production  TCU / ECU s witched on ,…

100%1 / 26
Issue 2, Nov 14
23
Operation Checklist
Product name:
Customer:
Line:
Shift(s)
Material description:
Stencil ser. No.
Reviewers name(s):
Date of Review:
Print Material
Gloves and PPE used
Correct quantity on stencil
Acclimatised
Within use by date
Comments:
Stencil
Matches product (check revisions)
Clean and free from damage
Fiducials in good condition
Storage adequate
Comments:
Boards
Clean and free from damage
Flat
Handled correctly (gloves used)
Comments:
Squeegees / ProFlow
Correct type (squeegee / head + wiper)
Correct length
Paste deflectors / Skis fitted correctly
Clean and free from damage
Storage adequate
Comments:
24
Issue 2, Nov 14
Operation Checklist (Continued)
Tooling
Correct type
Set up correctly
Stencil support used
Clean and free from damage
Storage adequate
Comments:
Pre-Production
TCU / ECU switched on , cables
connected, temperature matches
process spec.
USC vacuum unit switched on, cables
connected
Board clamps in good condition
Comments:
During production
Surface clean after print stroke
Tramlines scooped up regularly
Regular, small top ups of material
USC pushes stencil upwards during clean
Comments:
Consumables
Spare paper roll close to machine
Solvent funnel close to machine
Adequate quantity of acclimatised material
available
Comments:
Housekeeping
Daily maintenance performed
Cleaning materials available (gloves,
solvent, spatulas etc)
Comments:
Actions:
Owners:
Timescales:
Issue 2, Nov 14
25
NOTES: