Operation BWP Issue 2.pdf - 第26页

26 Issue 2, Nov 14

100%1 / 26
24
Issue 2, Nov 14
Operation Checklist (Continued)
Tooling
Correct type
Set up correctly
Stencil support used
Clean and free from damage
Storage adequate
Comments:
Pre-Production
TCU / ECU switched on , cables
connected, temperature matches
process spec.
USC vacuum unit switched on, cables
connected
Board clamps in good condition
Comments:
During production
Surface clean after print stroke
Tramlines scooped up regularly
Regular, small top ups of material
USC pushes stencil upwards during clean
Comments:
Consumables
Spare paper roll close to machine
Solvent funnel close to machine
Adequate quantity of acclimatised material
available
Comments:
Housekeeping
Daily maintenance performed
Cleaning materials available (gloves,
solvent, spatulas etc)
Comments:
Actions:
Owners:
Timescales:
Issue 2, Nov 14
25
NOTES:
26
Issue 2, Nov 14