Operation BWP Issue 2.pdf - 第26页
26 Issue 2, Nov 14

24
Issue 2, Nov 14
Operation Checklist (Continued)
Tooling
Correct type
Set up correctly
Stencil support used
Clean and free from damage
Storage adequate
Comments:
Pre-Production
TCU / ECU switched on , cables
connected, temperature matches
process spec.
USC vacuum unit switched on, cables
connected
Board clamps in good condition
Comments:
During production
Surface clean after print stroke
Tramlines scooped up regularly
Regular, small top ups of material
USC pushes stencil upwards during clean
Comments:
Consumables
Spare paper roll close to machine
Solvent funnel close to machine
Adequate quantity of acclimatised material
available
Comments:
Housekeeping
Daily maintenance performed
Cleaning materials available (gloves,
solvent, spatulas etc)
Comments:
Actions:
Owners:
Timescales:

Issue 2, Nov 14
25
NOTES:

26
Issue 2, Nov 14