Transfer & Installation Procedure
Chapter 7. Transfer & Installation
Procedure
7-1
Initial operation of this machine should be performed according to the following
procedure.
Warning
If the machine is installed or test run by an untrained
person, the machine might be damaged and personal
injury could occur.
The installation or test run of machine must be carried out
by our authorized C/S personnel only.
Installation procedure
1. Before heading to the site, the personnel in charge of the installation and test
operation shall confirm the shipment detail with the Production Management
Department, and inform the customer of the expected time of arrival at the site.
2. Following arrival at the site, a visual inspection of the external appearance of the
product (box distortion, etc.) shall be performed prior to unloading the machine.
3. Prior to unloading the machine, be sure to check the safety provisions and if
necessary, install the security fence to ensure safety. (ex: working in a high building)
4. The personnel in charge of the sales department shall: receive the delivery
confirmation and acceptance certificates from the operator; check the condition and
quantity of the machine after it has been unloaded; and, sign the receipt to complete
the take-over procedure with the operator.
5. When unloading the machine, the personnel in charge of the installation and test
operation shall give instructions to the workers from the machine handling company
to be careful that there will not be any damage to the machine caused by a forklift or
crane. He/she shall advise them of precautions in handling the fragile parts before
they unload the machine, and see that they use the proper jig and handling machine.
Unloading work shall be performed using a forklift and crane only.
6. Unpack the package.
Caution
When unpacking the machine, excessive shock may
damage the cover of the machine. Be careful not to apply
excessive force when unpacking the machine.
Before using a crane, the wood on the pallet shall first be
removed by wrench drill. Next, open the box and remove
the plastic cover. At this time, care should be taken not to
scratch the machine.
7. When using a forklift or crane for moving the machine, refer to the following figure
and procedure.
Samsung Component Placer CP45FV Series Introduction
Caution
If the lift arm (fork) of the forklift touches the bottom of the
machine cover, it may be damaged. The upper surface of
the forklift arm should only come into contact with the flat
surface of the bottom frame of the machine.
Also, ensure that the machine is not tilted. Check the
position of the forklift arm so that it does not damage the
feet or casters.
In case of using lift crane, the machine should be performed as following procedure.
When moving the machine by crane, safety should be considered first and foremost
and, the safety fence shall be installed. Pedestrians must be controlled to prevent any
accidents.
Remove the hole cabs in the front and at the rear of the machine. Insert steel bars of
36mm diameter (longer than 1700mm) into the two holes provided on the frame for
lifting the machine. Fix the steel bars so that they may not slide.
Sling ropes that can withstand the weight of the machine at the ends of the steel bar
and finish with wiring to prevent them from being removed or from sliding off. Next,
sling the rope on the crane hook. At this time, be sure to maintain the length of rope
constant so as to prevent the machine from being inclined. Also, check the lock of the
hook to prevent the machine from falling down or tilting in the air (see figure 5-1)
Wrap the surface of the cover with cardboard or wrap the rope with cloth to avoid
scratching of the cover by the rope.
Caution
When moving any machine, be sure to use a crane having
the capacity of more than two times the machine weight.
Otherwise, the machine might be broken or damaged. Also,
steel bars in compliance with the designated specifications
must be used.
7-2
Transfer & Installation Procedure
7-3
④ Check the hook locking
device.
③󰚟Sling the rope (check the rope length to
maintain the level of the machine).
②󰚟Insert the steel bar an
d
check its fixing state to
prevent perpendicula
r
leaning)
⑤󰚟 Protect the surface frombeing
scratched (preventing the cove
r
from damage).
Figure 7-1. How to move the machine using a crane
①󰚟Remove hole cup
8. When moving the machine to its final destination after it has been unloaded from the
pallet, it should be moved with all of its legs completely lifted. Be careful not to
break the casters in locations where barriers are located such as cargo elevators. In
principle, a hand lift shall be used to move the machine.
Caution
When the machine is installed on a surface that is made of
wood or shock absorbing material and not rigid enough,
excessive vibration may be generated during the machine
operation. Be sure to install the machine on a rigid surface.
9. Once the machine has arrived at its designation location, the position of a system line
where the machine is installed should be confirmed by the client’s supervisor. Then,
install the machine by moving it in left and right directions based on the position of
the machine where the tray feeder is installed.
10. In the case of in-line installation, the legs shall be adjusted so that they may be
aligned with the height of conveyors on the pre-process machine and after-process
machine. Before performing height adjustment, remove the front and rear covers of
the machine.
11. Remove the X clamps fixing the ball screws of the X axis (including the urethane
cushion).