T ransfer & Installation Pr ocedur e 7-7 with the connector at the left of the inside of the machine. 19. Following level adjustment, connect the keyboard and m ouse to the top of the front cover and install the teac…

Samsung Component Placer CP45FV Series Introduction
PCB #2
PCB #1
Adjust the machine level until there is no blocking sound at the gap between
machines while pushing the PCB slowly.
PCB #1 PCB #2
In the case of level adjustment between two machines, it is difficult to set the level of
the second machine so that its tolerance can be maintained to be less than 0.05 mm/m
because its conveyor cannot be leveled. Therefore, adjust the level of the machine so
that the level tolerance can be maintained to be less than 0.05 mm/m in the left and
right side direction of the PCB (PCB flow direction), and less than 0.1 mm/m in the
front and rear side direction of the PCB.
When adjusting the level of the machine legs, it is recommended to adjust the level in
one direction at a time by combining two legs into one set as per the following
Figure)
Level in the front and rear direction: Adjust the level of the front and rear legs in
pairs.
Level in the left and right direction: Adjust the level of the left and right legs in
pairs.
Adjust the legs in pairs
Direction of the level
Front and rear side
adjustment
Right and left side
adjustment
Figure 7-5. Adjusting the level between two machines
17. Install supports for the monitors and mount them on the top of the machine.
Assemble the connector inside of the machine and install two monitors (when
assembling, tighten the bolts completely)
18. Install the signal light with 4 bolts to the left of the top surface, and connect the lamp
7-6

Transfer & Installation Procedure
7-7
with the connector at the left of the inside of the machine.
19. Following level adjustment, connect the keyboard and mouse to the top of the front
cover and install the teaching box at the bottom right of the front panel.
Figure 7-6. Installing the monitors and signal light
20. Ensure that the machine power supply has been correctly connected to suit the use of
the machine.
Reference
Rating: Single phase, 60Hz, 220 Volt, voltage variation ± 5% (10Volt).
Power consumption: CP40(2.6 KVA), CP45(2.6 KVA)
Grounding: Based on 3
rd
class grounding, the Mega Test value shall be less than 100
Ω between the ground wire and the machine.
AVR: The AVR is a basic option. It is recommended to have the capacity margin at
more than 20%.
Caution
When taking a single phase power from a 3 phase power
source, any incidental trip of power may cause phase
distortion, which may lead to damage of the machine. To
avoid such an occurrence, total use of single phase power
is recommended to be less than 40% of the total capacity
(Kw).
21. Insert the power supply cable into the AC power input terminal. At this time, the
power should not be turned on.

Samsung Component Placer CP45FV Series Introduction
Figure 7-7. AC power input connection
22. Install the Standard Dump Box once the proper location for it has been determined.
23. Install the upward camera on a feeder base (rear feeder lane #42). At this time,
tighten the adjusting bolt completely. Furthermore, remove the dust cover on the
camera glass after installation has been completed to avoid any contamination.
24. Connect the pneumatic air line to the Main Air Inlet.
Figure 7-8. Supplying pneumatic air to the Main Air inlet
25. Turning the knob of the regulator, adjust the air pressure to 0.45 ~ 0.55 MPa. (The air
consumption of the machine is max. 150 Nℓ/min.)