Introduction(CP45FV) Eng.pdf - 第99页

T ransfer & Installation Pr ocedur e 7-9 Caution Oil leaka g e into the pneumatic pipe li ne due to the compressor being too old may cause fatal er rors in each machine. Foreign matters like chips and burs remain ins…

100%1 / 109
Samsung Component Placer CP45FV Series Introduction
Figure 7-7. AC power input connection
22. Install the Standard Dump Box once the proper location for it has been determined.
23. Install the upward camera on a feeder base (rear feeder lane #42). At this time,
tighten the adjusting bolt completely. Furthermore, remove the dust cover on the
camera glass after installation has been completed to avoid any contamination.
24. Connect the pneumatic air line to the Main Air Inlet.
Figure 7-8. Supplying pneumatic air to the Main Air inlet
25. Turning the knob of the regulator, adjust the air pressure to 0.45 ~ 0.55 MPa. (The air
consumption of the machine is max. 150 Nℓ/min.)
7-8
Transfer & Installation Procedure
7-9
Caution
Oil leaka
g
e into the pneumatic pipe line due to the
compressor being too old may cause fatal errors in each
machine. Foreign matters like chips and burs remain inside
the pipe once piping work is completed. Therefore, it is
recommended to flush the piping with the pipe ends being
covered with a clean cloth. If the cloth remains clean and
there is no sign of contamination, after a series of flushings,
then connect the pneumatic pipe to the machine. Check if
the air dryer has been installed to prevent moisture
condensing inside the pipe.
26. Referring to the following, check communication interface between the previous
process machine and the next process machine.
Start input signal (Cable No.:①〔+),②〔-))
The input signal is transmitted from the next process machine, and the voltage
measured at most of the input signal terminals is about 20~22V.
Ready output signal (Cable No.:③ , ④ )
The output signal is transmitted from all of the process machines. In general, at most
output signal terminals, the measured resistance is 0Ω when the output signal comes
out from the terminal while it is ∞Ω when there is no output signal.
IN
OUT
①
②③
④
①
②
③
④
Output Terminal
Input Terminal
DC24V〔+〕
①
②
③
④
DC 0V〔-〕
Figure 7-9. Interface between previous and next process machines
Samsung Component Placer CP45FV Series Introduction
Table 7-1. Signals and Interface
Signal Item Specifications Remark
PIN No.1: (+)Input Signal Less than
24 V/10mA
Busy Input(In)
PIN No.2: (-) Ground
PIN No.3: Contact output Board
Available
Output(Out)
PIN No.4: Contact output
AMP 206043-1 Machine Side
From
Next
M/C
Connector
AMP 206044-1 External Connection
PIN No.1: Contact output
Busy
Output(Out)
PIN No.2: Contact output
PIN No.3: (+) Input Signal Less than
24 V/10mA
Board
Available
Input(In)
PIN No.4: (-) Ground
AMP 206043-1 Machine Side
In-Line
Signal
From
Previous
M/C
Connector
AMP 206044-1 External Connection
When the I/F connector between adjacent machines is different from each other, cut
the cables and connect them referring to the following figure.
Unit#1 Unit#2 Unit#3
▶▶
PREVIOUS (IN)
NEXT (OUT)
20~22V
①②
20~22V
①②
20~22V
①②
0~
∞
Ω
③④
PREVIOUS (IN)
NEXT (OUT)
PREVIOUS (IN)
NEXT (OUT)
0~
∞
Ω
③④
0~
∞
Ω
③④
Machines manufactured not in accordance with the SMEMA code such as
SIMENS, SANYO and TDK (RX-11), and machines without dual contact
interface shall be examined specially.
Setup in accordance with dual contact method and SMEMA method when
determining the interface type
CP40: Execute SCPINI.EXE and Select ‘SMEMA’ checkbox from
OPTION(menu) with mouse.
CP45: Execute MARK3.exe and Click Pref (submenu) from
SYS.SETUP(menu) and select one of the options including Stand Alone,
SSA Type(dual contact) and SMEMA from IN(After) and OUT(After)
combo boxes.
27. Before turning on the main circuit breaker, check again to determine if there is any
obstacle inside the machine or on the conveyor.
28. If the area surrounding the machine is clear, turn on the main switch of the machine.
7-10