00193826-01.pdf - 第111页

User Manual SIPLAC E CS 5 Oper ator, Line engineer, Service engineer Software vers ion SR.101.xx 06/ 2003 US Edition 5.2 Tools for the operator 111 5.1.4 Programmer The progr ammer's job s are as fo llows: 5 – Prepa…

100%1 / 160
5 Operator, Line engineer, Service engineer User Manual SIPLACE CS
5.1 Personnel profile Software version SR.101.xx06/2003 US Edition
110
5.1.2 Line engineer
The line engineers should normally have attended the Compact Intro Package training course
and are to be assigned the following tasks:
Acting as a contact for the operators
Maintaining the machine log book
Monitoring and carrying out maintenance at the specified intervals
Monitoring the workplace to ensure that it is clean and safe
Monitoring conformity with ESD regulations
Carrying out quality control
Following up and reporting fault messages
Making sure that errors have been eliminated
Providing all materials required to produce the job in a timely manner, such as
–PCBs
Soldering paste
Components
Feeders, etc.
Setting up the station for a new production batch
Checking the settings of the feeders
Checking the management data
Asking the responsible programmers to modify placement programs
Ensuring a smooth flow of information between the individual groups
5.1.3 Service engineer
The service engineer's duties include: 5
Major maintenance jobs
Mounting replacement parts
Editing machine data
Calibrating the machine
User Manual SIPLACE CS 5 Operator, Line engineer, Service engineer
Software version SR.101.xx 06/2003 US Edition 5.2 Tools for the operator
111
5.1.4 Programmer
The programmer's jobs are as follows: 5
Preparing CAD files
Writing placement programs
Data maintenance
Data backup
5.2 Tools for the operator
All operators are to be equipped with the tools listed in the following. It is recommended to store
the tools in an appropriate container to avoid being injured when removing the tools from the con-
tainer (i.e. by a pair of tweezers).
Every operator of the machine requires:
SMD tweezers
A brush with short bristles to clean the component tables
A set of small regular and Phillips-head screwdrivers
A tape splicing clamp and splicing materials
Scissors for splicing tape (do not use multi-purpose scissors or diagonal cutters)
Erasers or fiberglass pens to remove fiducials
Indelible pens for marking the tracks
Cleaning agents (ethyl alcohol, Plexiglass cleaner, cotton wool tips, lint-free cloths,
pipe-cleaners)
WD40 corrosion protection
Vacuum cleaner
PLEASE NOTE 5
All tools of importance to the operator are contained in the SIPLACE operator kit. This can be or-
dered under part no. 00349303-xx.
5 Operator, Line engineer, Service engineer User Manual SIPLACE CS
5.3 When you change shift Software version SR.101.xx06/2003 US Edition
112
5.3 When you change shift
Æ Splice the tapes early. The feeders do not have to be refilled as soon as the new shift starts.
This avoids extended down times.
Æ At the shift change, pass important information on to the next operator. This includes, for in-
stance, changes to the placement program. Also read through the list of the descriptions of the
steps to take in Section 5.5
.
Æ Carry out a set-up check.
Make sure that the feeders are equipped with the correct components and that they are at the
correct locations in the component trolley.
NOTE
Hand over the line in the same state that you would want to find it in when starting your shift.
This means that: 5
The rejection containers are empty.
The waste containers are empty.
The conveyor areas have been cleaned with a vacuum cleaner.