00198609-01_AI_Replacing_the_X_and_Y_Trailing_Cable_EbS_EN.pdf - 第21页

在线预览 00198609-01_AI_Replacing_the_X_and_Y_Trailing_Cable_EbS_EN.pdf PDF 文档。

100%1 / 22
3 Replacing the Y trailing cable vacuum assembly
20 Assembly Instructions E by SIPLACE Replacing the X and Y Trailing Cable 04/2018
Unplug all pneumatic connections to the gantry.
Unplug all electrical connections from the trailing cable to the X and Y trailing cable interface.
Unplug all pneumatic connections to the valve joint.
Unplug the electrical connections to the trailing cable interface.
Fig.16: Bracket on top of trailing cable
Loosen the two screws and nuts
fastening the trailing cable chain to the
gantry. These screws (hexagonal bolts
[03023606-xx]) must be resealed with
Loctite 241 when fitted again.
Fig.17: Removing trailing cable
Loosen the four screws fastening the
bracket (1) on the top of trailing cable.
Remove the trailing cable from the
machine.
Installation
Follow the removal instructions in reverse order for installation. Also observe the following
instructions:
CAUTION
Installation instructions
Fix the screws fastening the trailing cable chain to the gantry and to the cover with Loctite
241.
Item no.: 00198609-01 ASM Assembly Systems Singapore Pte Ltd
535 Yishun Industrial Park A
ASM Tech-Park Building 2
Singapore 768775
www.asm-smt.com