X-S Speicification.pdf - 第11页
11 Modular Machine Concept Example of SIPLACE X4i S NC NC C&P20 C&P20 NC NC PA1 PA2 C&P20 COT In C&P20 PA1 Placement area 1 PA2 Placement area 2 OP Operator pan el C&P20 SIPLACE SpeedStar NC Nozzle ch…

10
Modular Machine Concept
Example of SIPLACE X4 S
NC
NC
CPP
CPP
NC
NC
PA1
PA2
CPP
COT
CPP
PA1 Placement area 1
PA2 Placement area 2
OP Operator panel
CPP SIPLACE MultiStar
NC Nozzle changer
NC2 Nozzle changer "row 2"
CAM Stationary cameras
BZ Buffer zone
COT Changeover table
IN Input area - conveyor
OUT Output area - conveyor
OP
OP
BZ
PLEASE NOTE: For all possible head configurations please refer to section Machine Performance from page 12.
COT
COT
COT
IN
OUT
OUT
BZ
IN
CAMCAM
NC2
NC2

11
Modular Machine Concept
Example of SIPLACE X4i S
NC
NC
C&P20
C&P20
NC
NC
PA1
PA2
C&P20
COT In
C&P20
PA1 Placement area 1
PA2 Placement area 2
OP Operator panel
C&P20 SIPLACE SpeedStar
NC Nozzle changer
BZ Buffer zone
COT In Changeover table at the inner
position
IN Input area - conveyor
OUT Output area - conveyor
OP
OP
BZ
PLEASE NOTE: For all possible head configurations please refer to section Machine Performance from page 12.
COT In
COT In
COT In
IN
OUT
OUT
BZ
IN

12
Machine Performance
Placement head types SIPLACE SpeedStar (C&P20)
SIPLACE MultiStar (CPP)
SIPLACE TwinStar (TH)
Placement performance
The placement performance is influenced by the different head combinations and head positions, plus the
conveyor configurations. Individual options and customized applications also influence the placement perfor-
mance. On request, SIPLACE can calculate the actual performance of your product on your machine config-
uration.
IPC value [components/h]
According to the vendor-neutral conditions of the IPC 9850 standard published by the Association of Con-
necting Electronics Industries.
SIPLACE benchmark value [components/h]
The SIPLACE benchmark value is measured during the machine acceptance tests. It corresponds to the
conditions set out in the SIPLACE scope of service and supply.
Theoretical maximum output value [components/h]
The theoretical maximum output value is calculated from the most favorable conditions for each machine
type and setting, and corresponds to the theoretical conditions normally used in the industry.
SIPLACE X3 S
See the note above for definition of placement performance values.
Machine Placement area 1 Placement area 2 IPC value Benchmark
value
Theoretical
value
X3 S-A C&P20 / C&P20 C&P20 64,983 76,450 86,006
C&P20 / C&P20 CPP_L 62,178 73,150 82,294
C&P20 / C&P20 CPP_H 59,075 69,500 78,188
CPP_L / CPP_L CPP_L 57,503 67,650 76,106
CPP_H / CPP_H CPP_H 49,725 58,500 65,813
CPP_L / CPP_L CPP_H 53,975 63,500 71,438
X3 S-B C&P20 / C&P20 TH 46,750 55,000 61,875
CPP_L / CPP_L TH 41,650 49,000 55,125
CPP_H / CPP_H TH 37,400 44,000 49,500
X3 S-C CPP_H / TH TH 24,735 29,100 32,738
X3 S-D TH / TH TH 11,900 14,000 15,750
CPP_H = Multistar CPP in high assembly position
CPP_L = Multistar CPP in low assembly position