00194385-01.pdf - 第33页
Installation of retaining clamp for lif ting axis/alignment of spindle/check of gear fixing for spindle, MTC2 06/2004 Edition 33 : Guide th e pin of th e retaining c lamp in to the fl anged n ut at the po sitio n shown i…

Installation of retaining clamp for lifting axis/alignment of spindle/check of gear fixing for spindle, MTC2
06/2004 Edition
32
: Loosen the six screws in order to pull the plate forward.
2
2
: Pull the docking plate forward in order to access the flanged nut.
It may be necessary to undo some cable ties in order to do this.
2
: Loosen the screw using the ratchet screwdriver with the size 4 hexagon head.
2
2
2
Loosen six screws
on the docking plate

Installation of retaining clamp for lifting axis/alignment of spindle/check of gear fixing for spindle, MTC2
06/2004 Edition
33
: Guide the pin of the retaining clamp into the flanged nut at the position shown in the picture.
2
Do not introduce into the stripper sleeve. 2
2
2
2
: Fix the retaining clamp using the screw (see top picture).
2
: Line up the docking plate with the marks you made earlier in order to screw in place, then fix
using the six screws.
2
2
2
Retaining
clamp
Hole for the pin of the retaining clamp
Screw

Installation of retaining clamp for lifting axis/alignment of spindle/check of gear fixing for spindle, MTC2
06/2004 Edition
34
2.5 Checking the gear wheel on the spindle
2
2
2
2
: Check that the screws used to fix the gear wheel onto the spindle are seated firmly.
Tighten the screws using a diagonal sequence.
2
2
2
CAUTION DANGER OF TIPPING 2
: Move both tray supplies into the penultimate refill position for the tray supply.
: Crank the MTC up as high as possible to allow better access to the screws.
DO NOT raise the MTC using lifting equipment (such as a fork-lift) and then stand underneath
the MTC to work. 2
2
Check that the screws are seated firmly
and tighten using a diagonal sequence