Installation of retaining clamp f or lifting axis/alignment of spindle/check of gear fixing for spindle, MT C2 06/2004 Edition 36 : Loose n the fou r scr ews on the top spi ndle blo ck (se e photogr aph). : Remove the tw…

100%1 / 42
Installation of retaining clamp for lifting axis/alignment of spindle/check of gear fixing for spindle, MTC2
06/2004 Edition
35
2.6 Aligning the spindle
During the alignment process, it will be necessary to dock the MTC in and out of the placement
machine several times. 2
2
: Carry out a reference run for the MTC2.
It moves right up.
: Remove all the cassettes.
: Move the MTC roughly to the penultimate pick-up position so that the lifting axis is as far as
possible in the bottom position.
: Loosen the four screws as shown in the picture.
The aluminum block should now be in the correct position on the spindle nut.
2
2
: Tighten the screws using a diagonal sequence.
2
Screws
Screws
Installation of retaining clamp for lifting axis/alignment of spindle/check of gear fixing for spindle, MTC2
06/2004 Edition
36
: Loosen the four screws on the top spindle block (see photograph).
: Remove the two screws used to fix the plate, then remove the plate.
Turn the screws loosely in the thread without tightening them.
2
: Move the tray supply into the top position.
The spindle can now be aligned.
If the spindle block is moved as the tray supply rises, the spindle was twisted when it was fitted.
It is now aligned correctly.
: Refit the plate and tighten the screws using a diagonal sequence.
: Move the tray supply into the refill position and insert a cassette.
2
2
2
2
Make sure there is a gap between cassette and plate. 2
2
2
2
2
2
2
Screws
Plate
Installation of retaining clamp for lifting axis/alignment of spindle/check of gear fixing for spindle, MTC2
06/2004 Edition
37
2.6.1 Assembly
: Reset the basic height of the MTC2 to the original value (see operating instructions for MTC2).
: Screw the cover shown in the picture back on again on the right and left.
Do not refit the other covers.
2
2
: Dock the MTC2 into the placement machine again.
2
Make sure that there are no people around the placement machine since there are live, unpro-
tected parts in the machine during the following steps. 2
Never reach into the openings while the MTC2 is plugged in since the axes can move. 2
2
: Plug in the power plug of the MTC2.
: Carry out a reference run.
: Insert the two bottom cassettes into the tray supplies once more.