SM321 Service-CHI.pdf - 第344页

Samsung Component Plac er SM321 Service Manual 13-16 HE AD I O BO A RD 조 립 위치도 HEAD I/O BOARD 상대편 조립위치 HEAD ILL BD CN2 FLAT CABLE(HD CAN) HEAD ILL CN1 SIDE ILL UP/DN SOL R AUX SENSOR SIDE ILL U/D SENSOR Z1~Z6 HOME SENSOR…

100%1 / 387
Board Ass’y
13-15
HEAD ILL BOARD 전면기 우측면 HEAD ILL BOARD 면기 측면
HEAD I/O BD SUPPORT
HEAD VAC SNS
CABLE 배선
HEAD IO BD조립 VAC SENSOR CABLE
BORAD ILL BOARD 前面基准右侧配线
BORAD ILL BOARD 前面基准左侧配线
BEAD I/O BD SUPPORT 组装
BEAD I/O BD SUPPORT 组装及 VAC SENSOR CABLE 配线
HEAD I/O
BD
下方
20mm
SUPPORT
使用
HEAD I/O BD
顶面 20mm
SUPPORT 使用
HEAD VAC SNS
CABLE 配线
Samsung Component Placer SM321 Service Manual
13-16
HEAD IO BOARD 위치도
HEAD I/O BOARD 상대편 조립위치
HEAD ILL BD CN2
FLAT CABLE(HD CAN)
HEAD ILL CN1
SIDE ILL UP/DN SOL
R AUX SENSOR
SIDE ILL U/D SENSOR
Z1~Z6 HOME SENSOR
R HOME SENSOR
SWING HOME SENSOR
FLAT CABLE(HD_PW, HD_SNS)
HEAD VAC SNS BD CN1
FLAT CABLE(HD SOL)
H1~H6 BLOW SOL
H1~H6 VAC SOL
Vacuum Sensor Board
1. 操作示教框执行设备初始化(Homing)
2. 正常关闭PC后关闭设备前面的Main Switch然后关掉Air阀。
Main Switch
(逆时针方向)
HEAD IO BOARD 组装位置图
对面组装位置
Board Ass’y
13-17
3. 请分离连接在BoardAir Tube
4. 利用Driver拧开Board的固定螺丝进行分离。
5. 替换Board后连接 Air Tube,按照拆卸的倒序进行组装。
6. 打开设备前面的Main Switch后参照4.10 Vacuum/Blow设置头部Vacuum
HEAD VAC/BLOW SOL CABLE 배선
TIE
작업
Vac. & Blow CableSol Cable Tie 作业时,防止与空压调整部分发生干扰。
Camera I/O Board
1. 操作示教框,把X Frame移动到后面。
HEADVAC/BLOWSOLCABLE
线
TIE
作业