YSi-V_Ope_E.pdf - 第61页
3-5 3 Daily operation n Setup procedure e 1 Pr ess the emergency stop button and then open the safet y co ver . 2 Remo ve the push-up pins. Remove the push-up pins to set up the board to be inspected. 3 Adjust the push-u…

3-4
3
Daily operation
4. Conveyor unit setup
When push-up pins are used for board support and the board to be inspected is different from the previous
one, the conveyor unit requires setup.
The conveyor width is automatically adjusted when loading the inspection program.
Here, the manual explains the procedure for laying out the push-up pins and the method of confirming the
status of supporting the board.
n
NOTE
When using the push-up plate, press the [Inspection Data] button to set the "Use Push Up Unit" item of the [Board] tab
to “Standard Use” or “Fast Use”.
n
Setup process flow diagram
Load board.
Select board.
Remove push-up pins.
Align push-up pin heights.
Lay out push-up pins.
[Push Up] button OFF
[Push Up] button ON
[Change] button ON
Check that board is secured correctly.
[Change] button OFF
Unload board.
Enter state of emergency stop.
Enter state of emergency stop.
Reset state of emergency stop.
Reset state of emergency stop.
Setup process flow diagram
Push-up pin layout
23301-M9-00

3-5
3
Daily operation
n
Setup procedure
e
1
Press the emergency stop button and then open the safety cover.
2
Remove the push-up pins.
Remove the push-up pins to set up the board to be inspected.
3
Adjust the push-up pin height.
Turn the support pins to adjust the height according to the thickness of the board to be inspected.
The push-up pin height of the single lane may vary from that of the dual lane.
• Support pin height for single lane : 140 mm – board thickness
• Support pin height for dual lane : 76 mm – board thickness
Push-up pin
Height adjustment
76 mm
140 mm
Support pin
Board
Magnet stand
Support pin
■ For single lane
■ For dual lane
Board
Magnet stand
23302-M9-00
4
Close the safety cover and reset the state of emergency stop.
Close the safety cover, cancel the emergency stop state, and press the [READY] button.
5
Select the board.
Select the board to be inspected.
6
Place a board at the inspection position.
Press the [Change] button and then place a board at the entrance of the conveyor.
[Change] button
[Change] button
24302-M9-10
e
7
Open the safety cover.
After making sure the board is clamped, press the emergency stop button and then open the safety
cover.

3-6
3
Daily operation
8
Arrange the push-up pins.
1. Press the [Unit] button in the button area, and press the [Push Up] button to lower the push-up plate.
[Push Up] button
[Push Up] button
[Unit] button
24303-M9-00
2. Arrange the push-up pins by taking the board size or mounting component positions into
consideration.
Arranging the push-up pins
Push-up pins
23303-M9-00
c
CAUTION
Be sure to lay out the push-up pins in a manner that they do not come into contact with the conveyor rails or other
components when the push-up plate is raised.
c
CAUTION
If the height of parts on the bottom of the board exceeds 30mm, do not use the push-up pin. Otherwise, the push-up
pin may interfere with a part.
9
Check that the board is uniformly clamped on the conveyor.
1. Press the [Push Up] button to raise the push-up plate.
2. Lightly press on the board by hand to check that there is no warp or play.
n
NOTE
If the tip of a push-up pin does not reach the backside of the board or pushes up the board too much, the push-up
pin height must be readjusted.
0
Unload the board.
1. Close the safety cover and reset the state of emergency stop.
2. Press the [Change] button to unload the board.