CP12 & 6 Head Part Exchange - Z-Axis Motor en.pdf - 第8页

在线预览 CP12 & 6 Head Part Exchange - Z-Axis Motor en.pdf PDF 文档。

100%1 / 20
E-by SIPLACE CP12 & CP6 Return the Nozzles and Shut Down the Machine
Part Exchange
3/3
CAUTION! Refer to safety instructions in user manual before working on the machine.
ESD guidelines are to be followed
Tool: Wear Part: Consumables:
13. Press start button. 14. Click on "setting options conveyor inter-
face and shut down" icon.
15. Click on "shut down machine" icon.
16. Switch off the machine. 17. Open cover and check for obstruction be-
fore move.
E-by SIPLACE CP12 & CP6 Removing the Head Front Part
Part Exchange
1/2
CAUTION! Refer to safety instructions in user manual before working on the machine.
ESD guidelines are to be followed
Tool: Wear Part: Consumables:
1. Remove the compressed air hose for the
blast air.
2. Disconnect the connection cable plug off
the gantry board.
3. Unplug the connection cable from sockets
in the base adapter and vision digital.
4. Carefully hold the DLM head and loosen the
four screws fastening the front part of the
head.
5. Put the front part of the C&P head on a
clean, soft and ESD material-proof surface.
6. Remove all the plungers and store properly.