N7201A653E.pdf - 第189页

EJM1EJ-MB-06 M-02 NPM-TT2 5 Detecting section 6 7 SERVO ON 6-9 -8 Every 560 hours Periodic Periodic Periodic Periodic inspection Clean the PCB detection sensors Attach the upper cover ● Secure the bolts of the cover with…

100%1 / 502
EJM1EJ-MB-06M-02NPM-TT2
Extension conveyor (option) 2
4
6-9-7
Cleaning the PCB
detection sensors 4
Maintenance
6-9
Sensor position installed to the Left side
Three bolts
A
Three bolts
Extension
conveyor
(Reflection type)
PCB detection sensor
View on arrow A
Verify the location and type of each PCB detection sensor.
PCB detection sensor
Reflection type: Two sets
EJM1EJ-MB-06M-02NPM-TT2
5
Detecting
section
6
7
SERVO
ON
6-9-8
Every
560
hours
PeriodicPeriodicPeriodicPeriodic
inspection
Clean the PCB detection sensors
Attach the
upper cover
Secure the bolts of the
cover with the Allen
wrench.
Touch the swab tip to detecting section of the PCB detection sensor (reflection type) and
move it as shown below to remove any stain.
EJM1EJ-MB-06M-02NPM-TT2
Inspecting the vacuum
air path
(placement head (option))
6-10-1
Describes how to inspect the vacuum air path.
Tool used: None Time required: 2 minutes (per stage)
Maintenance
6-10
1
or
2
A