00900002-01_UM_ASM-ProcessLens_EN.pdf - 第68页
4 Setting up and commissioning 4.4 Commissioning the machine 68 Instruction Guide ASM ProcessLens 02/2017 Fig.42: Position of the shipping braces - Front side of the machine (part 2) 1 Shipping braces

4 Setting up and commissioning
4.4 Commissioning the machine
Instruction Guide ASM ProcessLens 02/2017 67
4.4.2 Removing the shipping braces
► Remove all the shipping braces (see next three figures).
► If the ASM ProcessLens machine needs to be transported, always fit the shipping braces.
CAUTION
Always fit the shipping braces
Do not get rid of the shipping braces.
► Store the shipping braces for future use if ASM ProcessLens needs to be moved to
another location.
► If the ASM ProcessLens machine needs to be transported, always fit the shipping
braces.
Fig.41: Position of the shipping braces - Front side of the machine (part 1)
1 Shipping braces

4 Setting up and commissioning
4.4 Commissioning the machine
68 Instruction Guide ASM ProcessLens 02/2017
Fig.42: Position of the shipping braces - Front side of the machine (part 2)
1 Shipping braces

4 Setting up and commissioning
4.4 Commissioning the machine
Instruction Guide ASM ProcessLens 02/2017 69
Fig.43: Position of the shipping brace - Rear side of the machine
1 Shipping brace