00900002-01_UM_ASM-ProcessLens_EN.pdf - 第76页

5 Working with the machine 5.2 Switching on/off the ASM ProcessLens 76 Instruction Guide ASM ProcessLens 02/2017

100%1 / 82
5 Working with the machine
5.2 Switching on/off the ASM ProcessLens
Instruction Guide ASM ProcessLens 02/2017 75
5.2 Switching on/off the ASM ProcessLens
NOTICE
Operator Manual ASM ProcessLens
For a detailed description, please refer to the Operator Manual ASM ProcessLens [Item
No.: 00900067-xx]
To switch on the ASM ProcessLens machine, proceed as follows:
Check whether the stations are connected to the power supply.
Perform a visual check of the stations.
Make sure that there are no obstacles in the travel range of the inspection head assembly.
Make sure that the conveyor is free of any PCB.
Switch the station on at the main power switch.
To switch off the ASM ProcessLens machine, proceed as follows:
End all inspection procedures.
Make sure there are no boards inside the ASM ProcessLens.
5 Working with the machine
5.2 Switching on/off the ASM ProcessLens
76 Instruction Guide ASM ProcessLens 02/2017
6 Preventive Maintenance
Instruction Guide ASM ProcessLens 02/2017 77
6 Preventive Maintenance
To ensure that your ASM ProcessLens is always in perfect condition for use in your production en-
vironment, the machine should be maintained on a regular basis. Workflows have been defined for
each maintenance interval. These combine the individual steps to form an efficient sequences of
tasks in order to optimize the "Uptime" for each maintenance task.
ASM ProcessLens maintenance documentation
The ASM ProcessLens maintenance documentation contains recommendations for the mainten-
ance tasks to be performed at each maintenance interval. All maintenance tasks are explained in
detail and illustrated in the following Job Cards for ASM ProcessLens:
Job Card ProcessLens Workflow 1 [Item No.: 00900059-xx]
Job Card ProcessLens Workflow 2 [Item No.: 00900060-xx]
Job Card ProcessLens Workflow 3 [Item No.: 00900061-xx]
Job Card ProcessLens Workflow 4 [Item No.: 00900062-xx]
Maintenance workflows
We differentiate between four workflows which are to be performed independently of one another
per maintenance interval.
Workflow 1
Weekly maintenance tasks.
Workflow 2
Combination of weekly and 3-monthly maintenance tasks.
Workflow 3
Combination of weekly and 6-monthly maintenance tasks.
Workflow 4
Combination of weekly and 12-monthly maintenance tasks.
Planning workflows
Each workflow is supported with a document (job card), which guides you efficiently through the
maintenance work.
Example for the frequency of individual workflows over a period of one year:
Workflow 1
45 times / year
Workflow 2
4 times / year
Workflow 3
2 times / year
Workflow 4
1 time / year