np134 mechanical reference-1.1e.pdf.pdf - 第24页

5. Pickup and inspection With mark reading complete, the parts can now be picked up. The head rotates, and the 16 nozzles (A to P) sequentially pick up the required parts from the supply unit. Part inspection is performe…

100%1 / 110
1. Machine Overview
Machine Movement During Operation
The movement of the machine when operation is started is explained below.
1. Board check
When the START button is pressed, a check is
made of whether a board is present on the
conveyor. If a board is not present, a request
signal is sent to the previous machine in the
line, and if a board is available, board loading
is performed as detailed in step 2. If a board
is already present on the conveyor, nozzle
change is performed as detailed in step 3.
2. Panel loading
When the panel available signal is received
from the previous machine in the line, the in-
conveyor shuttle moves to the panel loading
position and the panel is loaded onto the
shuttle. The shuttle moves the panel to the
main conveyor position. The panel travels
from the shuttle along the main conveyor
until it reaches the stopper. The panel is then
clamped in position, raising it to production
height.
3. Nozzle change
Nozzle change is performed as required for
the production program in use. Nozzles (or
mechanical chucks) are selected from those
available in the nozzle station.
4. Mark reading
When nozle change is complete, the skip and
fiducial marks on the board are now
inspected by the mark camera attached to the
placing head.
Part 1 Chapter 1 Machine Overview
Edition 1.0 1-1-1 NP-134E/134ME Mechanical
5. Pickup and inspection
With mark reading complete, the parts can
now be picked up. The head rotates, and the
16 nozzles (A to P) sequentially pick up the
required parts from the supply unit. Part
inspection is performed on the fly as the
rotation of the head moves each nozzle in
turn to the position of the camera prism.
Parts for which a problem was detected are
rejected to the reject parts box, and recovery
is performed in line with the settings made
by the operator.
6. Placement
After passing over the camera, the placing
head moves to the board to place of the parts.
Placement, like pick-up, is also performed
sequentially starting from head A. The head
returns to pick up more parts, repeating steps
5 and later, until the machine has carried out
all of its placement sequences.
7. Panel unclamping and unloading
When production of the panel is finished, the
panel is unclamped and conveyed onto the
out-conveyor. The panel available signal is
sent to the next machine. Panel unloading
commences upon receipt of a panel request
signal from the next machine. The panel
stopper is lowered, and the panel is
unloaded.
Part 1 Chapter 1 Machine Overview
Edition 1.0 1-1-2 NP-134E/134ME Mechanical
2. Machine Components
General View
<NP-134E>
NP1MN051a
Safety cover
Breaker
Operation box 1
Control box
Relay box 1
Signal tower
Vacuum pump
Relay box 2
Air inlet
Operation box 2
Safety cover
Signal tower
Front Side (Side 1)
Rear Side (Side 2)
Part 1 Chapter 2 Machine Components
Edition 1.0 1-2-1 NP-134E/134ME Mechanical