00198487-02_Operation_Manual_E_by_DEK_EN.pdf - 第12页
Operation - Machine Overview 12 Machine Assemblies ⃞ Print carriage ⃞ Squeegee assembly ⃞ Rail system (moving rail and fixed rail) ⃞ Camera system ⃞ Rising table ⃞ Tooling ⃞ Under Screen Cleaner ⃞ Vacuum (optional with u…

Operation - Machine Overview
11
3 Operation - Machine Overview
1. Coloured Beacon
2. Monitor
3. Keyboard

Operation - Machine Overview
12
Machine Assemblies
⃞ Print carriage
⃞ Squeegee assembly
⃞ Rail system (moving rail and fixed rail)
⃞ Camera system
⃞ Rising table
⃞ Tooling
⃞ Under Screen Cleaner
⃞ Vacuum (optional with under screen cleaner)

Operation - Machine Overview
13
Programmable Tower Lamp With Buzzer
Red – ON System Power off
Halted by Error
Amber - ON Initialisation
Set – up
Maintenance
Amber and Green
- ON
Paper Empty
Solvent Empty
Green – ON Operational
Waiting in Ready State