DECAN_S2_Maintenance(Eng_Ver4.3).pdf - 第33页
chapt er 2 Inspe ction It ems fo r Main t e nanc e Advanced Chip Shooter DE CAN S2 M ain ten an ce H and bo ok 2- 6 Monthly Inspections (1/2) Inspection It ems for Maint enanc e

chapter 2
Inspection Items for Maintenance
Advanced Chip Shooter
DECAN S2 Maintenance Handbook
2-5
Monthly Inspections (1/2)
Check-up List
Replacement
Time
Reference
Time
required
Period No Inspection Item Measures Tools
Monthly
M-1 Head Spindle Clean Air gun, cloth 30 Minutes
M-2 Conveyor Sensor / Fiducial Mark Inspect and clean Cotton swab, cloth 10 Minutes
M-3 Right Cover Cooling Fan Inspect and Replace
Flathead Screw driver, vacuum
cleaner
10 Minutes
M-4 Front, Rear Cover Cooling Fan Inspect and Replace Vacuum cleaner 6months 15 Minutes
Setting the replacement period for parts
ㆍ Based on the regulated use environment.
ㆍ If the use environment is poor, the intervals for part inspection and replacement can be shortened.
ㆍ In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (1/2)

chapter 2
Inspection Items for Maintenance
Advanced Chip Shooter
DECAN S2 Maintenance Handbook
2-6
Monthly Inspections (1/2)
Inspection Items for Maintenance

chapter 2
Inspection Items for Maintenance
Advanced Chip Shooter
DECAN S2 Maintenance Handbook
2-7
Monthly Inspections (2/2)
Check-up List
Replacement Time Grease
Time
required
Period No Inspection Item Measures Tools
Monthly
M-5 Y Axis Linear Motor, Magnet Inspect and clean cloth 15 Min
M-6 Control Rack Cooling Fan Inspect and clean
Flathead Screw driver, Vacuum
cleaner
10 Min
M-7 Head Spindle, Mirror CAM
Cleaning and
apply grease
Brush, cloth, Syringe
Inspection period:
3months
GREASE-GADUS_S2 V220 2
GREASE AFF-70
30 Min
M-8 Beam Splitter Inspect and clean Air spray, (+) driver 20 Min
M-9
X Frame LM Guide, Ball
Screw
Cleaning, apply
grease,inject
grease
Lubricator, cloth, wrench(M3, M4)
Industrial use paper wipe, Steel
plate with thickness of 2.0mm
Lubrication period: 4
months
GREASE-GREASE_AFE-CA 60 Min
M-10 Y Frame LM Guide
Clean and inject
grease
Lubricator, cloth
Lubrication period: 2
months
GREASE-GREASE_AFE-CA 60 Min
M-11
Conveyor LM Guide, Lead
Screw
Cleaning, apply
grease,inject
grease
Lubricator, Brush, cloth
Lubrication period: 6
months
Grease period: 2months
GREASE GADUS S2 V220-2 30 Min
M-12 Cover Cleaning
Ultra-fine fiber cloth, Alcohol,
Heavy Duty Staticide #2005, #2001
Inspection period: 1
months
30 Min
Setting the replacement period for parts
ㆍ Based on the regulated use environment.
ㆍ If the use environment is poor, the intervals for part inspection and replacement can be shortened.
ㆍ In the above table, C/S means our designated C/S company (STS) or our overseas local agents.
Monthly Inspections (2/2)