NPM Calibration Manual-En.pdf - 第53页
NPM Maint en anc e E di ti on 9.8 Li ne Camer a Page 9-52 EJM9BE-M B-09M-21 16 Turn ON the se rvo switch. 17 Press [Yes]. 18 Turn OFF the se rvo switch. 19 Open the s afety cover. 20 Relocate the line cam era jig. 12-noz…

NPM
Maintenance Edition
9.8 Line Camera
EJM9BE-MB-09M-21 Page 9-51
10
Turn ON the servo switch.
11
Press + [OK].
•
The calibration is carried out.
∗
For the 12-nozzle head and the 8-nozzle
head, perform step 18 onward.
∗
For the 2-nozzle head, proceed to the
following steps continuously.
12
Turn OFF the servo switch.
13
Open the safety cover.
14
Check the head installation angle.
∗
Check that the nozzle holder claw is on the
left side.
15
Close the safety cover.
Nozzle holder claw
UnitCalibLineCamera-03E00
11

NPM
Maintenance Edition
9.8 Line Camera
Page 9-52 EJM9BE-MB-09M-21
16
Turn ON the servo switch.
17
Press [Yes].
18
Turn OFF the servo switch.
19
Open the safety cover.
20
Relocate the line camera jig.
12-nozzle head
∗
Relocate the line camera jig from the nozzle
position 9
→
4.
8-nozzle head
∗
Relocate the line camera jig from the nozzle
position 6
→
3.
2-nozzle head
∗
Relocate the line camera jig from the nozzle
position 1
→
2.
UnitCalibLineCamera-04E00
17

NPM
Maintenance Edition
9.8 Line Camera
EJM9BE-MB-09M-21 Page 9-53
21
Close the safety cover.
22
Turn ON the servo switch.
23
Press + [OK].
•
The calibration is carried out.
∗
For the 2-nozzle head, perform steps 12 to 17
again, and proceed to the following steps.
24
Check that it is successfully complete.
25
Press + [Camera offset].
UnitCalibLineCamera-06E00
24
25
UnitCalibLineCamera-05E00
23