M6_ServiceManual_e.pdf - 第9页
1 Installation 1-1 1 Installation
MX-20 (Option)......................................................................................................3-27
MXR-20 (Option)...................................................................................................3-28
MX-ST2 (Option)...................................................................................................3-29
Specified Lubricants...............................................................................................3-30
4 Electrical Section........................................................................................4-1
Signal I/O............................................................................................................................4-2
Signal Input Monitor.................................................................................................4-2
Signal Output Control...............................................................................................4-5
Serial I/O...................................................................................................................4-8
Signal Output Map....................................................................................................4-9
Signal Input Map ....................................................................................................4-13
Control Board ...................................................................................................................4-18
Handling Control Board..........................................................................................4-18
Electrodes on Feeder / Feeder Bank .................................................................................4-19
Adjustment of Board Detection Sensors...........................................................................4-20
Cautions about overall electrical items.............................................................................4-22
5 Materials......................................................................................................5-1
Standard Accessories..........................................................................................................5-2
Replacement Parts...............................................................................................................5-4

1 Installation
1-1
1
Installation

1 Installation
1-2
Installation of Machine
Environmental Requirements
Install the machine at the place where the below conditions are met.
Do not do tasks, such as moving the machine or connecting the machine with the main switch ON to
prevent electric shock.
■ Ambient Temperature: Accuracy assurance 23 +/-2 degrees centigrade
Operation assurance 5 to 40 degrees centigrade
(The average over a period of 24 hours does not exceed 35 degrees C.)
■ Relative Humidity: 45 to 60 percent, non-condensing
■ Atmosphere: Dust and corrosive gas free
■ Floor: Floor must be flat and sturdy enough for freedom from vibration during
operation.
■ Power Requirements: 200 VAC +/- 10%, three phase, 50/60 Hz
* 208/220/240/380/400/415/440V VAC with optional power transformer
Power consumption: 1.65 KW
Capacity: 7.0 kVA
Leakage current: 20mA or less
* Power and ground the machine independently of other machines which may be a
noise source, such as a compressor, welding machine, or reflow soldering machine
with magnetic contacts.
Warning