1OM-1603-006_w.pdf - 第143页
1OM-1603 3-18 2. Pattern Program Change : Chap.3 2.2.6 How to Use the Feeder Set Jig The feeder set jig is a table for the tape feeder to x it temporarily when the component reload work is performed for the tape feeder …

1OM-1603
3-17
2. Pattern Program Change : Chap.3
1012-001
(6) Connect the connector of the cart to the connector on the machine side and
set the connector xing lever in place.
Notice
When the bank feeder change cart must be pushed into the
machine, push it straight such that the guide on the machine side
can be located inside the cart arm.
(7) Press the Feeder Ready switches of the machine.
(The feeder base starts moving up and the LED of the Feeder Ready switches
starts ickering, indicating that the feeder base is being activated.)
(8) Press the Feeder Ready switches of the machine.
The feeder READY switch LED is turned ON and the feeder base is
clamped.

1OM-1603
3-18
2. Pattern Program Change : Chap.3
2.2.6 How to Use the Feeder Set Jig
The feeder set jig is a table for the tape feeder to x it temporarily when the
component reload work is performed for the tape feeder where the splicing
operation is not to be performed. Also, the power can be supplied from the main
machine using the tape feeder setting connector and a cable. This jig enables the
operator to perform the component reload work or adjustment work for each tape
feeder.
F1C13-1
[1] Tape Feeder Holding Guide
This guide holds the tape feeder when a single tape feeder is adjusted.
[2] Tape Feeder Fixing Base
This base is used to put the tape feeder on it.
[3] Tape Feeder Power Connector Socket
This connector is used for tape feeder DC power output.
[4] Tape Feeder Connecting Cable
Using this cable, the tape feeder power connector is connected to the tape
feeder connector to supply the power to the tape feeder.
1108-001

1OM-1603
3-19
2. Pattern Program Change : Chap.3
2.2.6.1 Tape Feeder Attachment
F1C13-2
CAUTION
When you need to bend down to perform work, you
may hit your head on the tape feeder worktable and
get injured.
Procedure
(1) Remove the tape feeder where components are to be reloaded, from the
feeder base on the bank feeder change cart and attach it onto the tape feeder
holding guide.
(Insert the tape feeder slowly along the tape feeder holding guide to the end).
Insert it to the end.
F1C13-3
1108-001