a2-100-en(v3_0).pdf - 第11页

A2 Automatic Dispenser V3 .0 9 7 7 . . 2 2 T T h h r r e e e e t t y y p p e e s s o o f f b b u u i i l l t t - - i i n n c c l l e e a a n n g g i i n n g g b b o o x x f f o o r r c c l l i i e e n n t t s s ’ ’ c c h…

100%1 / 18
A2 Automatic Dispenser V3.0 8
and press the piston rod for 2-3 times. Repeat the foregoing steps till there is no colorant drops out.
Rotate the turntable and empty the canisters in turns with the same method.
The machine will lift and press the piston rod for recirculation and exhausting the air automatically in every
24 hours.
Do not lift the piston rod if not necessary
Please cover the lids promptly to avoid evaporation of colorant.
6
6
.
.
5
5
C
C
a
a
l
l
i
i
b
b
r
r
a
a
t
t
i
i
o
o
n
n
o
o
f
f
C
C
o
o
l
l
o
o
r
r
a
a
n
n
t
t
s
s
The machine had been calibrated in the factory. Customers can also recalibrate in 4-7 hours after colorants have
been filled if they need. A scale with minimum accuracy of 0.001g and the colorant density are a must for
recalibration.
Stir for 30 minutes after adding colorants, to remove bubbles.
When no continuous dispensing of colorants, please re-empty air or check if nozzle is blocked.
All the preparation steps are followed, the colorants could be dispensed after 4 hours.
7. Operation
The operations of how to search, dispense and modify the formula are explained in the software using manual.
The operator can operate the machine according to the user manual. But normally, the operator should be got well
trained to operate the dispenser better
The machine should be powered on all the time, there will be no action when emergency button is pressed.
The colorant volume in canister should not be lower than 0.5L.
7
7
.
.
1
1
P
P
u
u
t
t
t
t
h
h
e
e
b
b
a
a
s
s
e
e
p
p
a
a
i
i
n
n
t
t
c
c
a
a
n
n
1) Select a lead rail with proper height for the tray.
(The upper rim of the paint can shall be higher
than the sensor.) Insert the tray inside the rail
till the bottom.
2) Open the lid of the base paint can.
3) Locate the base paint can in the center of the
tray.
4) Start dispensing
1、如图所示,立板
两个六角螺栓 M8×20、两个垫
8 通过底板固定到底梁上。
2、如图所示,区分小桶架板
总成、大桶架板总成、顶层架板总
成。
Fig.7.1.
1
Tray
Lead Rail
Sensor
Tray Center
A2 Automatic Dispenser V3.0 9
7
7
.
.
2
2
T
T
h
h
r
r
e
e
e
e
t
t
y
y
p
p
e
e
s
s
o
o
f
f
b
b
u
u
i
i
l
l
t
t
-
-
i
i
n
n
c
c
l
l
e
e
a
a
n
n
g
g
i
i
n
n
g
g
b
b
o
o
x
x
f
f
o
o
r
r
c
c
l
l
i
i
e
e
n
n
t
t
s
s
c
c
h
h
o
o
i
i
c
c
e
e
ACleaning of the type A built-in cleaning box
The cleaning box is build-in. The daily maintenance and periodically maintenance shall be implemented
by following the reminders from the dispensing software.
The hairbrush shall be used in the following manners to ensure the cleaning effects
Detailed steps as below
1 Lift the locking handle to loose the cleaning box.
2 Hold the box handle, take it out.
3 You may clean the brush wheel and the cleaning box separately. Clean each valve bottom thoroughly.
4 Put the cleaning box back, please make sure it is in bottom position, and push down lock handle
B Cleaning of the type B built-in cleaning box.
1. Cleaning of the cleaning box
The cleaning box is built-in. The daily maintenance and periodically maintenance shall be implemented
according to the dispensing software reminders.
Please follow these steps to clean the cleaning box to ensure the cleaning effects.
Lock Handle
Clean each
valve bottom
A2 Automatic Dispenser V3.0 10
Detailed steps as below:
1 Remove the connection pipe, lift the locking handle as figure to loosen the cleaning box.
2 Pull the cleaning box out as below figure.
3 Take the sponge brush and other parts out and clean them with water.
4 Put back of the sponge brush and other parts in proper order.
5 Put the cleaning box back, turn the locking handle to press the cleaning, install the water pipe.
2. Clean the cup
1 Remove the cup as figure
2 Pour out the sewage, clean the cup and refill
3 80%-90% fresh water of the cup capacity.
4 Put the cup back and screw it down.
C. Cleaning of the type C built-in cleaning box.
The cleaning box is built-in. The daily maintenance and periodically maintenance shall be implemented
Take inner
parts out and
clean them
with water.
Remove the
connection
pipe, loosen
the cleaning
box as figure.
Clean bottom of all
the valve body
Rotate the cup to remove it.