00194482-02_AI_NozzleChanger_X_605_DE+EN.pdf - 第63页
Assembly instructions Nozzle changer SIPLACE X-Series / D3 11/2011 Edition 63 SITEST 2 : S tart SITEST (Service enginee r mode). : Carry out a full reference run. : Switch to the "C&P head" menu. : If neces…

Assembly instructions Nozzle changer SIPLACE X-Series / D3
11/2011 Edition
62
2
2
2
2
2
2
2
2
2
2
2
2
2
2

Assembly instructions Nozzle changer SIPLACE X-Series / D3
11/2011 Edition
63
SITEST 2
: Start SITEST (Service engineer mode).
: Carry out a full reference run.
: Switch to the "C&P head" menu.
: If necessary, switch to the "Nozzle changer configuration" menu and fill the magazines with
nozzles.
: Switch to the "Nozzle changer magazine functions" menu.
2
2
: Calibrate the magazine positions, pick-up positions and pick up heights one after the other.
2
2
2
2
2
2

Assembly instructions Nozzle changer SIPLACE X-Series / D3
11/2011 Edition
64
2.9 Commissioning the nozzle changer
: When you fill a magazine with a certain nozzle type for the first time, attach an adhesive label
to identify the type.
2
: Fill the magazines off the placement machine.
: Only ever replace complete magazines.
: Open the locking plate and place the nozzles in the nozzle holders.
: Close the locking plate so that the nozzles cannot drop out of the magazines.
2
2
Before you fill magazines, make sure that all the nozzles on the Collect&Place head have been
returned to their magazines. 2
2
2
Do not allow components to drop onto the magazines. If they do, they could jam the locking plate.
Clean the magazines and free locations regularly with a vacuum cleaner (see Preventive Mainte-
nance). 2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2