00198596-02_JC_3M_C&P20P2M3_EN.pdf - 第24页

6 3-monthly C&P20 P2/M3 Clean / lubricate the DP linear guide 15 min 2 / 3 Refer to safety instructions in user manual before commencing Maintenance NOTICE! ESD guidelines are to be followed Tool: T21, T22, T23 Wear …

100%1 / 62
6 3-monthly C&P20 P2/M3 Clean / lubricate the DP linear guide 15 min 1 / 3
Refer to safety instructions in user manual before commencing Maintenance
NOTICE! ESD guidelines are to be followed Tool:
T21, T22, T23
Wear Part: Consumables:
C10, C22
www.asm-smt.com
1 Prepare the multipette. See appendix
"Prepare the multipette.
2 Turn the wheel and adjust 2 µl. 3 Put the head stand in the upright position
and turn the head upside down.
4 Ensure the Z-Axis is moved into the head
before turning the star as otherwise the Z-
Axis jaw can be damaged.
5 Rotate segment 1 to the service window
and align it with the service mark to en-
sure the DP bearing sits properly in the Z-
axis jaw!
6 Move the Z-axis out of the head and hold
it there.
6 3-monthly C&P20 P2/M3 Clean / lubricate the DP linear guide 15 min 2 / 3
Refer to safety instructions in user manual before commencing Maintenance
NOTICE! ESD guidelines are to be followed Tool:
T21, T22, T23
Wear Part: Consumables:
C10, C22
www.asm-smt.com
7 Clean the DP linear guide on both sides. 8 Move the Z-axis into the head and turn the
star until the next segment is aligned to
the service mark.
9 Repeat step 6 to 8 for each segment.
10 When segment 1 is in the service window
again align it to the service mark to ensure
the DP bearing sits properly in the Z-axis
jaw!
11 Move the Z-axis out of the head and hold
it there.
12 Apply 1 x 2 μl with a slight motion to the
center of the left and 1 x 2μl to the center
of the right guide.
6 3-monthly C&P20 P2/M3 Clean / lubricate the DP linear guide 15 min 3 / 3
Refer to safety instructions in user manual before commencing Maintenance
NOTICE! ESD guidelines are to be followed Tool:
T21, T22, T23
Wear Part: Consumables:
C10, C22
www.asm-smt.com
13 Move the Z-axis 5 times up and down. 14 Repeat step 11 to 13 one more time. 15 Move the Z-axis into the head and turn the
star until the next segment is aligned to
the service mark.
16 Repeat step 11 to 15 for each segment. 17 When segment 1 is in the service window
again dry clean all segment tops from any
remaining grease.
18 Clean up the multipette. See appendix
"Clean up the multipette".