00198596-02_JC_3M_C&P20P2M3_EN.pdf - 第26页

www.asm-smt.com

100%1 / 62
6 3-monthly C&P20 P2/M3 Clean / lubricate the DP linear guide 15 min 3 / 3
Refer to safety instructions in user manual before commencing Maintenance
NOTICE! ESD guidelines are to be followed Tool:
T21, T22, T23
Wear Part: Consumables:
C10, C22
www.asm-smt.com
13 Move the Z-axis 5 times up and down. 14 Repeat step 11 to 13 one more time. 15 Move the Z-axis into the head and turn the
star until the next segment is aligned to
the service mark.
16 Repeat step 11 to 15 for each segment. 17 When segment 1 is in the service window
again dry clean all segment tops from any
remaining grease.
18 Clean up the multipette. See appendix
"Clean up the multipette".
www.asm-smt.com
7 3-monthly C&P20 P2/M3 Clean / lubricate the DP drive bearing 4 min 1 / 3
Refer to safety instructions in user manual before commencing Maintenance
NOTICE! ESD guidelines are to be followed Tool:
T21, T22, T24
Wear Part: Consumables:
C13, C22
www.asm-smt.com
1 Prepare the multipette. See appendix
"Prepare the multipette".
2 Turn the wheel and adjust 1 µl. 3 Turn the head right side up and put the
head stand flat on the table.
4 Ensure the Z-Axis is moved into the head
before turning the star as otherwise the Z-
Axis jaw can be damaged.
5 Turn the star until segment 1 is in the ser-
vice window.
6 Push in the segment and hold it there.