SIPLACE S-23 HM.pdf - 第91页
User Manual SIPLAC E S-23 HM 2 Operational Safety Software Version SR.406.xx 02/00 US Edition 2.6 Lock out and t ag out procedure 91 2.6.4 Responsibilities 1. It shal l be the respo nsibility of the main tenance and el e…
2 Operational Safety User Manual SIPLACE S-23 HM
2.6 Lock out and tag out procedure Software Version SR.406.xx 02/00 US Edition
90
Stored energy in the compressed air supply or electrical energy in electrolytic capacitors must
be released by appropriate means. 2
– After switching off the placement machine wait until the voltages and the compressed air
have discharged to be able work without any risk.
6. Verify the lock out.
– Testing the lock out can be done simply by pressing the start button.
7. The following steps must be taken to restore the machine to operation.
8. Check the area, authorized employees should remove all of their tools and reinstall all guards.
9. Notify all affected employees.
Before removing even one lock or tag, inform all workers in the area that the machine is going
to be restarted. 2
10.Remove locks/tags
Each authorized employee must remove his or her own lock. Each authorized employee will
have his or her own lock. 2
11.Turn the machine on. Authorized workers should observe the equipment in operation to insure
repairs were done correctly.
2.6.3 Testing
The maintenance or electrical person may test the circuits by energizing the circuit for a short
period of time without voiding the lock out procedure provided. This may be done only when no
other work is being performed by any other person on the equipment being tested. 2
It is extremely important that all remote start switches be tagged with the “Do Not Operate” tag to
prevent inadvertent operation of the equipment during these periods. 2
User Manual SIPLACE S-23 HM 2 Operational Safety
Software Version SR.406.xx 02/00 US Edition 2.6 Lock out and tag out procedure
91
2.6.4 Responsibilities
1. It shall be the responsibility of the maintenance and electrical personnel to make sure this pro-
cedure is adhered to.
2. It shall be the responsibility of the maintenance and electrical personnel’s immediate
supervisor to instruct his personnel on this procedure.
3. It shall be the responsibility of the Safety Officer with assistance from the Safety Committee,
Health Service Department, and the various managers and Vice-Presidents to administer the
Lock Out / Tag Out Procedure.
2.6.5 Training
1. Employee training
The safety regulations require training for every individual, of course every employee is not ex-
posed to the same degree of danger or is involved with LO/TO as others are. So extensive
training is not necessary for everyone. 2
2. To determine how much training to provide for each worker, the employees are divided into
three groups. Each group has its own level of training.
3. Authorized employees
These workers actually install the locks and tags and do the maintenance or service work. So
they must know the most about controlled energy. First, they must be able to recognize all
energy sources and measure the amount of energy. Authorized employees must look for en-
ergy sources out of the realm of the obvious. These energy sources include electrical, mechan-
ical, hydraulic, pneumatic, chemical, thermal and gravitational. Once these workers can
recognize all energy sources they must be taught how to isolate, control, and release the en-
ergy without any risk. 2
4. Affected employees
These are workers who operate the machinery or equipment that may be de-energized. Other
employees who may be affected include those who work in an area that contain equipment that
may be locked/tagged out. These employees have to be instructed about the nature of the en-
ergy control program, they must know why lock/tag out is important, what tags and locks look
like and why they must not remove tags or locks. 2
5. All others
As the name implies, any employee who is not affected or authorized fits into this category.
There employees include office personal, engineers, managers, and upper management. Al-
though they do not have a direct relationship to the machinery being locked or tagged, they
have to receive some training. 2
2
2 Operational Safety User Manual SIPLACE S-23 HM
2.6 Lock out and tag out procedure Software Version SR.406.xx 02/00 US Edition
92
6. To evaluate the lock/tag out procedure, the safety department will conduct periodic inspec-
tions. As part of the inspection the safety department will document that all facets of the pro-
cedure are followed. The safety department will follow up with formal classroom review or re-
training of the LO/TO procedure.
2.6.6 Review
This procedure will be reviewed and amended as required but in no case less frequently than once
a year. 2
2.6.7 Appendix
These procedures represent the minimum lock/tag out requirements. Any additional safeguards
needed to complete work safely can be specified by facilities supervision, the safety officer, the
safety committee and the health department. 2