00197089-02_AI_EA-Verl_X-Serie_S_de_en.pdf - 第65页

Installation 3.2.6 Output Conveyor – Conveyor Side B Overview of Conversion (Before/After) Extension Input/Output Conveyor and Hand Guard Ein-/Ausga beband verlängerung und Eingreifschutz 65 3.2.6 3 . 2 . 6 O u t p u t C…

100%1 / 80
Installation
Overview of Conversion (Before/After) 3.2.5 Output Conveyor – Conveyor Side A
64 Extension Input/Output Conveyor and Hand Guard Ein-/
3.2.5
3.2.5 Output Conveyor Conveyor Side A
Output Conveyor – Conveyor Side A
A Conveyor side without extension B Conveyor side with extension
1 The idler pulley is converted from (1a) to
(1b).
2 The screw M5x14.7 (TX25) without nut re-
mains.
3 The screw M5x14.7 (TX25) without nut re-
mains.
4 The old idler is no longer required. It is
moved over to the machine center. It must
not touch the new idler (5).
5 This deflection pulley already present takes
on the job of the idler. (No conversion re-
quired, just loosen)
6 Measurement point for belt tension: 85+-
9Hz
7 This nut is removed. The screw itself re-
mains unchanged.
Installation
3.2.6 Output Conveyor – Conveyor Side B Overview of Conversion (Before/After)
Extension Input/Output Conveyor and Hand Guard Ein-/Ausgabebandverlängerung und Eingreifschutz 65
3.2.6
3.2.6 Output Conveyor Conveyor Side B
Output Conveyor – Conveyor Side B
A Conveyor side without extension B Conveyor side with extension
1 The idler pulley is converted from (1a) to
(1b).
2 The screw M5x14.7 (TX25) without nut re-
mains.
3 The screw M5x14.7 (TX25) without nut re-
mains.
4 The old idler is no longer required. It is
moved over to the machine center. It must
not touch the new idler (5).
5 This deflection pulley already present takes
on the job of the idler. (No conversion re-
quired, just loosen)
6 Measurement point for belt tension: 85+-
9Hz
7 This nut is removed. The screw itself re-
mains unchanged.
Installation
Overview of Conversion (Before/After) 3.2.7 Output Conveyor – Conveyor Side C
66 Extension Input/Output Conveyor and Hand Guard Ein-/
3.2.7
3.2.7 Output Conveyor Conveyor Side C
Output Conveyor – Conveyor Side C
A Conveyor side without extension B Conveyor side with extension
1 The idler pulley is converted from (1a) to
(1b).
2 The screw M5x16 (TX25) with nut remains.
3 The screw M5x16 (TX25) with nut remains. 4 The old idler is no longer required. It is
moved over to the machine center. It must
not touch the new idler (5).
5 This deflection pulley already present takes
on the job of the idler. (No conversion re-
quired, just loosen)
6 Measurement point for belt tension: 81+-
8Hz