00197288-02_AI_TBO_SX12_V2_DE_EN.pdf - 第30页

4 Anhang 4.1 Messprotokoll 30 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V2 Thick Board Option Option Dicke Leiterplatte 02/2019

100%1 / 56
4 Anhang
4.1 Messprotokoll
Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V2 Thick Board Option Option Dicke Leiterplatte
02/2019
29
4 Anhang
4.1 Messprotokoll
Maß- und Höhenabweichung Portal zu LP-Transport (für ET und DT)
Datum Name Maschinen-Nr.
Gemessen von der Oberkante der Loslager-Laufschiene des Portals auf die Transportwangen
____________ ____________ Ausgabeseite
Eingabeseite
____________ ____________
____________ ____________ ____________ ____________
Messung Portal 1 Messung Portal 1
____________ ____________ ____________ ____________
____________ ____________ ____________ ____________
Spur 2 Spur 1
____________ ____________ Ausgabeseite
Eingabeseite
____________ ____________
____________ ____________ ____________ ____________
Messung Portal 2 Messung Portal 2
____________ ____________ ____________ ____________
____________ ____________ ____________ ____________
Spur 2 Spur 1
MAX-Wert MIN-Wert Abweichung in mm
4 Anhang
4.1 Messprotokoll
30 Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V2 Thick Board Option Option Dicke Leiterplatte
02/2019
31Assembly Instructions / Montageanleitung SIPLACE SX1/SX2 V2 Thick Board Option Option Dicke Leiterplatte
02/2019
Contents
Contents
1 Introduction.. 33
1.1 Safety instructions.. 33
1.1.1 Conventions for the use of safety instructions and symbols.. 33
1.1.2 Safety instructions for working with strong magnetic fields.. 33
1.1.3 Safety instructions for the power supply (without SMPS).. 34
1.1.4 Safety instructions for the power supply (with SMPS).. 35
1.1.5 Safety instructions for the gantry.. 36
1.1.6 Safety instructions on hazardous materials.. 36
1.1.7 Classification of the optical systems.. 37
1.1.7.1 Classification of the whole machine.. 37
1.1.7.2 Laser classification.. 37
1.1.7.3 Classification of the camera systems.. 37
1.2 Preparatory work..... 37
1.3 Other instructions.. 39
1.3.1 Environmentally-friendly disposal of materials and components.. 39
1.3.2 Use of original accessories and spare parts.. 39
1.3.3 ESD guidelines.. 39
1.3.3.1 What does ESD mean?.. 39
1.3.3.2 Important measures to protect against static charging.. 40
1.3.3.3 Handling ESD modules.. 40
1.3.3.4 Measurements and modifications to ESD modules.. 40
1.3.3.5 Dispatching ESD modules.. 40
1.3.4 Release History.. 40
1.4 Staff qualifications and training.. 41
1.5 Abbreviations.. 41
2 Brief Description.. 43
2.1 Product Description.. 43
2.2 Prerequisites.. 43
2.3 Restrictions.. 43
2.4 Scope of Delivery.. 43
2.5 Tools and Equipment Required.. 44
2.6 Required Working Time.. 44
3 Installation.. 45
3.1 Overview of Conveyor for SX1/SX2 V2.. 45
3.1.1 Single Conveyor.. 45
3.1.2 Dual Conveyor.. 45
3.1.3 Width Adjustment.. 46
3.2 Preparatory Steps.. 46
3.3 Lowering the Conveyor.. 47
3.4 Converting the Clamping Plate.. 49
3.5 Converting the Clamping Rail.. 50
3.6 Final Work.. 51
3.7 Software Settings.. 52
3.7.1 Heavy Boards.. 52