00900160-01_UM_ASM-ProcessLensDualLane_en.pdf - 第4页

4 Instruction Guide ASM ProcessLens Dual-lane 06/2018 Table Of Contents 2.2.4 Other Labels .. 28 2.2.4.1 Label - External grounding point .. 28 2.2.4.2 Label – Ground .. 28 2.3 Safety instructions for transporting …

100%1 / 86
3Instruction Guide ASM ProcessLens Dual-lane 06/2018
Table Of Contents
Table Of Contents
1 Introduction.. 7
1.1 Machine overview.. 7
1.1.1 Machine description.. 8
1.1.2 Serial number of the machine.. 8
1.1.3 EU Declaration of Conformity.. 9
1.1.4 Use as prescribed.. 9
1.1.5 Failure to use as prescribed.. 9
1.1.6 Noise emissions.. 9
1.1.7 Important notes on environmentally-friendly disposal of materials and components.. 9
1.1.8 Electromagnetic compatibility (EMC).. 10
1.1.9 Note on original ASM SMT Solutions accessories.. 10
1.2 Qualification and training of personnel.. 10
1.3 Operator levels.. 11
1.4 Important notes on this Instructor Guide.. 11
1.4.1 Contents and filing of this Instructor Guide.. 11
1.4.2 Danger notes.. 11
1.4.3 Manufacturer's/supplier's liability.. 11
1.4.4 Revision table.. 12
1.4.5 Further information about and contents of the documentation package.. 12
1.4.5.1 How to get information.. 12
1.4.5.2 ASM SMT Solutions on the World Wide Web (WWW).. 12
1.4.6 Abbreviations.. 12
2 Safety.. 13
2.1 Conventions for the use of safety instructions and symbols.. 13
2.1.1 Qualified personnel.. 13
2.1.2 Important notes on operational safety.. 13
2.1.2.1 General.. 14
2.1.2.2 Safety of operators and other persons.. 14
2.1.2.3 Safety of plant and equipment.. 14
2.1.3 Safety instructions for laser units.. 15
2.1.4 Safety instructions on permanent magnets.. 15
2.2 Warning labels.. 18
2.2.1 Warning labels on the machine.. 19
2.2.2 Warning labels in the machine.. 21
2.2.3 Description of the warning labels.. 24
2.2.3.1 Warning label W 201.. 24
2.2.3.2 Warning label W 81-00382.. 25
2.2.3.3 Warning label – Laser class 2.. 25
2.2.3.4 Warning label W202.. 25
2.2.3.5 Warning label W 210.. 26
2.2.3.6 Warning label W 209.. 26
2.2.3.7 Warning label W203.. 26
2.2.3.8 Warning label W204.. 26
2.2.3.9 Warning label W206.. 27
2.2.3.10 Warning label - Hazardous Voltage.. 27
2.2.3.11 Warning label P010 - Do Not Touch.. 27
2.2.3.12 Warning label HS - Hot Surface.. 27
2.2.3.13 Warning label PSUC - Power Supply Unit Cover.. 28
2.2.3.14 Warning label – Laser radiation.. 28
4 Instruction Guide ASM ProcessLens Dual-lane 06/2018
Table Of Contents
2.2.4 Other Labels.. 28
2.2.4.1 Label - External grounding point.. 28
2.2.4.2 Label – Ground.. 28
2.3 Safety instructions for transporting the machine.. 29
2.4 Safety instructions for operating the machine.. 30
2.4.1 Safety instructions for closing the protective covers.. 30
2.4.2 Insertion of board into the input and output conveyor.. 31
2.4.3 ESD safety of machine.. 31
2.5 Safety features.. 32
2.5.1 Protective hood, doors and covers.. 32
2.5.2 Switches and buttons on the machine.. 34
2.5.2.1 Position of switches and buttons on the machine.. 34
2.5.2.2 Description of functions.. 35
2.5.2.3 Position of protective switch on the machine.. 37
2.5.3 EMERGENCY STOP loops and signaling circuit.. 38
2.5.3.1 EMERGENCY STOP loop structure.. 38
2.5.3.2 Description of the functions of the EMERGENCY STOP loops.. 38
2.6 Residual voltages and discharge times in the machine.. 38
2.6.1 Energy state of the machine after the EMERGENCY STOP button is pressed.. 38
2.6.2 Energy state of the machine after switching off the main power switch.. 39
2.6.2.1 Machine switched off at the main power switch and disconnected.. 39
2.7 Lock out and tag out procedure.. 39
2.7.1 Purpose and scope.. 39
2.7.2 Description.. 40
2.7.3 Testing.. 41
2.7.4 Responsibility and obligations.. 41
2.7.5 Training.. 41
2.7.6 Review.. 41
2.8 ESD Guidelines.. 42
2.8.1 What does ESD mean?.. 42
2.8.2 Important measures to protect against static charging.. 42
2.8.3 Handling ESD modules.. 42
2.8.4 Measurements and modifications to ESD modules.. 43
2.8.5 Dispatching ESD modules.. 43
3 Machine description.. 45
3.1 Overview of the modules.. 45
3.1.1 Overview of assemblies.. 45
3.1.2 Inspection head.. 46
3.1.2.1 Description.. 46
3.1.3 PCB conveyor assembly.. 47
3.1.3.1 Description.. 47
3.1.4 Definition of PCB warpage.. 48
3.1.4.1 PCB warpage on the conveyor.. 48
3.1.4.2 Maximum PCB warpage allowed during processing of the board.. 49
3.2 Technical data.. 51
3.2.1 Dimensions and ambient conditions for machine operation.. 51
3.2.2 Ambient conditions for packaging, transportation and storage.. 51
3.2.3 Center of Gravity.. 52
3.2.4 Electrical Ratings.. 52
3.2.5 Conveyor specifications.. 53
3.2.6 Inspection capabilities.. 53
5Instruction Guide ASM ProcessLens Dual-lane 06/2018
Table Of Contents
3.2.7 Solder paste inspection capabilities.. 53
3.2.8 Program generation specifications.. 53
4 Setting up and commissioning.. 55
4.1 Transport and delivery configuration.. 55
4.1.1 Shipping packaging.. 55
4.1.1.1 Transporting environment condition.. 55
4.1.1.2 Shipping packaging dimensions.. 55
4.1.1.3 Weight of machine when ready for dispatch.. 55
4.1.2 Checking a delivery.. 56
4.1.3 Configuration when delivered.. 56
4.1.4 Transporting the machine in the crate.. 57
4.1.4.1 Services.. 57
4.1.4.2 Safety instructions.. 57
4.1.4.3 Means of transport.. 57
4.1.4.4 Forklift attachment points on the transport crate or pallet.. 57
4.1.5 Transporting the machine without a crate or pallet.. 58
4.1.5.1 Safety instructions.. 58
4.1.5.2 Means of transport.. 58
4.1.5.3 Forklift attachment points on the machine.. 58
4.1.5.4 Points that MUST be noted when transporting the machine.. 59
4.2 Infrastructure at the installation location.. 60
4.2.1 Recommendations for foundation quality.. 60
4.2.1.1 Maximum ground levelness.. 60
4.2.1.2 Machine weight and floor loading.. 60
4.2.2 Main power supply.. 60
4.2.2.1 Checking the main power supply.. 60
4.2.2.2 Power supply cable - specification.. 60
4.2.2.3 Mains connection - delivery configuration.. 61
4.3 Setting up the machine.. 62
4.3.1 Warning instructions.. 62
4.3.2 Lifting and transporting the machine with the forklift truck.. 62
4.3.3 Fitting attached parts.. 63
4.3.3.1 Checking and setting the protective cover switch.. 63
4.3.3.2 Fitting the tower lamp.. 63
4.3.3.3 Fixing the monitors.. 64
4.3.4 Tools and equipment.. 64
4.3.5 Adjusting the machine height.. 64
4.3.5.1 Presetting the height of the machine feet.. 65
4.3.6 Levelling the machine.. 66
4.3.7 Removing the corrosion protection from the guide rails.. 67
4.4 Commissioning the machine.. 67
4.4.1 Commissioning the machine at the installation site.. 67
4.4.2 Removing the shipping braces.. 68
5 Working with the machine.. 73
5.1 Controls and displays.. 74
5.1.1 Overview.. 74
5.1.2 Description.. 75
5.2 Switching on/off the ASM ProcessLens Dual-lane.. 77
6 Options.. 79
6.1 UPS Option.. 79