00900160-01_UM_ASM-ProcessLensDualLane_en.pdf - 第80页
6 Options 6.2 Barcode rail extension 80 Instruction Guide ASM ProcessLens Dual-lane 06/2018

6 Options
6.1 UPS Option
Instruction Guide ASM ProcessLens Dual-lane 06/2018 79
6 Options
6.1 UPS Option
●
Item No.: 00701915-xx
Description
The UPS (APC 620 SC) is an option for the ASM ProcessLens. It is used to prevent data loss in
case of a machine power failure (e.g caused by a facilities breakdown). By using the UPS, the
machine will force the PC to auto save and auto shutdown.
After the installation, whenever the machine is switched on or off, you need to press the UPS
power button. If you power on the machine without pressing the UPS power button, it will not power
up the PC even though the main power switch of the machine is already turned on.
When shutting down, you have to press the power button of the UPS after the machines is turned
off with the main switch.
6.2 Barcode rail extension
●
Item No.: 03170788-xx
Description
The barcode rail extension is needed for the barcode scanner module.

6 Options
6.2 Barcode rail extension
80 Instruction Guide ASM ProcessLens Dual-lane 06/2018

7 Preventive Maintenance
Instruction Guide ASM ProcessLens Dual-lane 06/2018 81
7 Preventive Maintenance
To ensure that your ASM ProcessLens Dual-lane is always in perfect condition for use in your pro-
duction environment, the machine should be maintained on a regular basis. Workflows have been
defined for each maintenance interval. These combine the individual steps to form an efficient se-
quences of tasks in order to optimize the "Uptime" for each maintenance task.
ASM ProcessLens Dual-lane maintenance documentation
The ASM ProcessLens Dual-lane maintenance documentation contains recommendations for the
maintenance tasks to be performed at each maintenance interval. All maintenance tasks are ex-
plained in detail and illustrated in the following Job Cards for ASM ProcessLens:
●
Job Card ProcessLens Workflow 1 [Item No.: 00900059-xx]
●
Job Card ProcessLens Workflow 2 [Item No.: 00900060-xx]
●
Job Card ProcessLens Workflow 3 [Item No.: 00900061-xx]
●
Job Card ProcessLens Workflow 4 [Item No.: 00900062-xx]
Maintenance workflows
We differentiate between four workflows which are to be performed independently of one another
per maintenance interval.
●
Workflow 1
– Weekly maintenance tasks.
●
Workflow 2
– Combination of weekly and 3-monthly maintenance tasks.
●
Workflow 3
– Combination of weekly and 6-monthly maintenance tasks.
●
Workflow 4
– Combination of weekly and 12-monthly maintenance tasks.
Planning workflows
Each workflow is supported with a document (job card), which guides you efficiently through the
maintenance work.
Example for the frequency of individual workflows over a period of one year:
●
Workflow 1
– 45 times / year
●
Workflow 2
– 4 times / year
●
Workflow 3
– 2 times / year
●
Workflow 4
– 1 time / year