00196624-04_Service Manual WPC5_6_EN_01-2019.pdf - 第116页
Service Manua l WPC5 / WPC6 Page 4-116 ➢ Place the „ Jig for W PC4-6 base p late “ [03073064- 01] (or a WPTC) i n the feed area (machine). ➢ Make sure that the driv er has engaged with t he gauge properly and that th e…

Service Manual WPC5 / WPC6
Page 4-115
4.1.2 Teaching the Zero Point Position
This calibration step determines the position of the lifting axis, for correct movement of the
waffle-pack tray carrier out of the tower (without obstacles).
➢
Remove all waffle-pack tray carriers (WPTC) from the WPC.
➢ Select the lifting axis (1).
➢ Select the function
Teach zero position
(2).
➢ Select
Next
(3).
➢
Follow the instruction shown and continue with
Next
.
➢ Follow the instruction shown (see following diagram) and continue with
Next.

Service Manual WPC5 / WPC6
Page 4-116
➢ Place the „Jig for WPC4-6 base plate“ [03073064-01] (or a WPTC) in the feed area
(machine).
➢ Make sure that the driver has engaged with the gauge properly and that the gauge is
correctly fitted onto the guide rail.

Service Manual WPC5 / WPC6
Page 4-117
➢ Use the arrow keys (2) to select the required pitch (1) (0.1 mm in this example).
➢ Use the arrow keys to move the tower so that the tray can be correctly moved from the feed
axis into the tower.
➢ Continue with
Next
(3).
➢ Follow the instruction shown and confirm the changes made with
Finish
.